A study on the performance of scheduling rules in buffer-constrained dynamic flowshops

被引:16
作者
Holthaus, O
Rajendran, C
机构
[1] Univ Passau, Dept Operat Prod & Logist Management, Fac Business Adm & Econ, D-94032 Passau, Germany
[2] Indian Inst Technol, Ind Management Div, Dept Humanities & Social Sci, Madras 600036, Tamil Nadu, India
关键词
D O I
10.1080/00207540210146107
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Most studies on scheduling in manufacturing systems using dispatching rules deal with jobshops, while there are only few reports dealing with dynamic flowshops. It is known that the performance of many dispatching rules in dynamic jobshops is different from that in dynamic flowshops. Moreover, many research reports assume that there are no buffer constraints in the shop, and even those reports dealing with buffer-constrained shops present the evaluation of existing dispatching rules for unconstrained shops in the context of buffer constraints with the consideration of a limited number of objectives of scheduling. In this study, we deal with the problem of scheduling in dynamic flowshops with buffer constraints. With respect to different time-based objectives, the best dispatching rules for scheduling in unconstrained shops have been identified from the existing literature. In addition, two new dispatching rules specially designed for flowshops with buffer constraints are proposed. All dispatching rules under consideration are evaluated in dynamic flowshops with buffer constraints on the basis of an extensive simulation study covering different levels of buffer constraints, shop load or utilization, and missing operations in flowshops. The proposed rules are found to perform better than the existing dispatching rules in buffer-constrained flowshops with respect to many measures of performance.
引用
收藏
页码:3041 / 3052
页数:12
相关论文
共 23 条
[11]   Determination of the number of containers, production kanbans and withdrawal kanbans; and scheduling in kanban flowshops - Part 2 [J].
Hemamalini, B ;
Rajendran, C .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2000, 38 (11) :2549-2572
[12]   Efficient dispatching rules for scheduling in a job shop [J].
Holthaus, O ;
Rajendran, C .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1997, 48 (01) :87-105
[13]   Efficient jobshop dispatching rules: further developments [J].
Holthaus, O ;
Rajendran, C .
PRODUCTION PLANNING & CONTROL, 2000, 11 (02) :171-178
[14]   COMPARATIVE PERFORMANCE ANALYSIS OF PRIORITY RULES IN A CONSTRAINED FLOW-SHOP WITH MULTIPLE PROCESSORS ENVIRONMENT [J].
HUNSUCKER, JL ;
SHAH, JR .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1994, 72 (01) :102-114
[15]   New dispatching rules for shop scheduling: a step forward [J].
Jayamohan, MS ;
Rajendran, C .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2000, 38 (03) :563-586
[16]   FLOWSHOP SEQUENCING PROBLEMS WITH LIMITED BUFFER STORAGE [J].
LEISTEN, R .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1990, 28 (11) :2085-2100
[17]   AN EFFICIENT DYNAMIC DISPATCHING RULE FOR SCHEDULING IN A JOB-SHOP [J].
RAGHU, TS ;
RAJENDRAN, C .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1993, 32 (03) :301-313
[18]   Formulations and heuristics for scheduling in a Kanban flowshop to minimize the sum of weighted flowtime, weighted tardiness and weighted earliness of containers [J].
Rajendran, C .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1999, 37 (05) :1137-1158
[19]   A comparative study of dispatching rules in dynamic flowshops and jobshops [J].
Rajendran, C ;
Holthaus, O .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1999, 116 (01) :156-170
[20]  
RAMASESH R, 1990, OMEGA, V16, P43