Sequencing CONWIP flow-shops: analysis and heuristics

被引:19
作者
Framinan, JM
Ruiz-Usano, R
Leisten, R
机构
[1] Univ Seville, Escuela Super Ingn, Dept Org Ind & Gest Empresas, Seville, Spain
[2] Univ Duisburg, Fac Business Adm & Econ, D-47057 Duisburg, Germany
关键词
D O I
10.1080/00207540110048972
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this paper, we address the backlog sequencing problem in a flow-shop controlled by a CONWIP production control system, with the objective to minimize the makespan. We characterize the problem and analyse its similarities and differences with the unconstrained permutation flow-shop problem. A comparison of some well-known flow-shop heuristics is carried out, and a simple and fast dispatching rule is proposed. Regarding the more simple and faster heuristics, the proposed dispatching rule outperforms those commonly used for the unconstrained permutation flow-shop problem.
引用
收藏
页码:2735 / 2749
页数:15
相关论文
共 46 条
[1]   SIMULATED VERSUS REAL LIFE DATA IN TESTING THE EFFICIENCY OF SCHEDULING ALGORITHMS [J].
AMAR, AD ;
GUPTA, JND .
IIE TRANSACTIONS, 1986, 18 (01) :16-25
[2]  
[Anonymous], 1970, MANAGE SCI, DOI [10.1287/mnsc.16.10.b630, DOI 10.1287/MNSC.16.10.B630]
[3]  
Berkeley B. J., 1992, Production and Operations Management, V1, P393, DOI 10.1111/j.1937-5956.1992.tb00004.x
[4]   Comparison of production-line control mechanisms [J].
Bonvik, AM ;
Couch, CE ;
Gershwin, SB .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1997, 35 (03) :789-804
[5]   GENERIC KANBAN SYSTEMS FOR DYNAMIC ENVIRONMENTS [J].
CHANG, TM ;
YIH, Y .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1994, 32 (04) :889-902
[6]   EVALUATION OF FLOW SHOP SEQUENCING HEURISTICS [J].
DANNENBRING, DG .
MANAGEMENT SCIENCE, 1977, 23 (11) :1174-1182
[7]   CONWIP-based production lines with multiple bottlenecks: performance and design implications [J].
Dar-El, EM ;
Herer, YT ;
Masin, M .
IIE TRANSACTIONS, 1999, 31 (02) :99-111
[8]  
DUDEK RA, 1964, OPERATIONS RES, V12
[9]   A SIMPLE RELEASE POLICY FOR NETWORKS OF QUEUES WITH CONTROLLABLE INPUTS [J].
DUENYAS, I .
OPERATIONS RESEARCH, 1994, 42 (06) :1162-1171
[10]   SEQUENCING 2-MACHINE FLOW-SHOPS WITH FINITE INTERMEDIATE STORAGE [J].
DUTTA, SK ;
CUNNINGHAM, AA .
MANAGEMENT SCIENCE SERIES A-THEORY, 1975, 21 (09) :989-996