Feasibility study for a standalone solar-wind-based hybrid energy system for application in Ethiopia

被引:219
作者
Bekele, Getachew [1 ]
Palm, Bjorn [1 ]
机构
[1] KTH, Dept Energy Technol, Stockholm, Sweden
关键词
Hybrid energy system; Ethiopia; Wind energy; Sunshine duration; Primary load; Deferrable load; Initial capital; Net present cost (NPC); CONVERSION SYSTEM; SIZE OPTIMIZATION; BATTERY STORAGE;
D O I
10.1016/j.apenergy.2009.06.006
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
The aim of this paper is to investigate the possibility of supplying electricity from a solar-wind hybrid system to a remotely located model community detached from the main electricity grid in Ethiopia. The wind energy potential of four typical locations has been assessed in a previous article. The solar potential has also been investigated and the results are presented in detail in an accompanying article awaiting publication. For one of the sites, Addis Ababa, the results of the investigation are given here in detail. For the other sites, the results are given as sensitivity diagrams only. Based on the findings of the studies into energy potential, a feasibility study has been carried out on how to supply electricity to a model community of 200 families, which comprises 1000 people in total. The community is equipped with a community school and a health post. The electric load consists of both primary and deferrable types and comprises lighting, water pumps, radio receivers, and some clinical equipment. A software tool, Hybrid Optimization Model for Electric Renewables (HOMER) is used for the analysis. The result of the analysis is a list of feasible power supply systems, sorted according to their net present cost. Furthermore, sensitivity diagrams, showing the influence of wind speeds, PV costs, and diesel prices on the optimum solutions are also provided. (C) 2009 Elsevier Ltd. All rights reserved
引用
收藏
页码:487 / 495
页数:9
相关论文
共 14 条
[1]  
BANU YE, 2009, APPL ENERG, V86, P1387
[2]  
BEKELE G, APPL ENERGY UNPUB
[3]   Wind energy potential assessment at four typical locations in Ethiopia [J].
Bekele, Getachew ;
Palm, Bjorn .
APPLIED ENERGY, 2009, 86 (03) :388-396
[4]   Design and techno-economical optimization for hybrid PV/wind system under various meteorological conditions [J].
Diaf, S. ;
Notton, G. ;
Belhamel, M. ;
Haddadi, M. ;
Louche, A. .
APPLIED ENERGY, 2008, 85 (10) :968-987
[5]   Size optimization of a PV/wind hybrid energy conversion system with battery storage using response surface methodology [J].
Ekren, Orhan ;
Ekren, Banu Yetkin .
APPLIED ENERGY, 2008, 85 (11) :1086-1101
[6]   Break-even analysis and size optimization of a PV/wind hybrid energy conversion system with battery storage - A case study [J].
Ekren, Orhan ;
Ekren, Banu Y. ;
Ozerdem, Baris .
APPLIED ENERGY, 2009, 86 (7-8) :1043-1054
[7]  
*ETH DTSCH GTZ GMB, 2005, WIND EN PROGR TERNA
[8]   Optimum sizing of an autonomous wind-diesel hybrid system for various representative wind-potential cases [J].
Kaldellis, JK ;
Vlachos, GT .
APPLIED ENERGY, 2006, 83 (02) :113-132
[9]  
*MET, 2004, MET GLOB MET DAT APP
[10]   Assessment of solar and wind energy resources in ethiopia .2. Wind energy [J].
Mulugetta, Y ;
Drake, F .
SOLAR ENERGY, 1996, 57 (04) :323-334