Priority rule-based heuristic for multi-mode resource-constrained project scheduling problems with resource vacations and activity splitting

被引:59
作者
Buddhakulsomsiri, Jirachai [1 ]
Kim, David S.
机构
[1] Thammasat Univ, Sch Mfg Syst & Mech Engn, Sirindhorn Int Inst Technol, Pathum Thani 12121, Thailand
[2] Oregon State Univ, Dept Ind & Mfg Engn, Corvallis, OR 97331 USA
关键词
project scheduling; heuristics; priority rules; moving resource strength; MODES; RESTRICTIONS; ALGORITHM; SEARCH;
D O I
10.1016/j.ejor.2006.02.010
中图分类号
C93 [管理学];
学科分类号
120117 [社会管理工程];
摘要
This paper presents a priority rule-based heuristic for the multi-mode resource-constrained project scheduling problem with the splitting of activities around unavailable resources allowed. All resources considered are renewable and each resource unit may not be available at all times due to resource vacations, which are known in advance. A new concept called moving resource strength is developed to help identify project situations where activity splitting is likely to be beneficial during scheduling. The moving resource strength concept is implemented in priority rule-based heuristics to control activity splitting when scheduling. Multiple comparisons of the performance of combination of activity-mode priority rules used in the heuristics are provided. Computational experiments demonstrate the effectiveness of the heuristic in reducing project makespan, and minimizing activity splitting. (c) 2006 Elsevier B.V. All rights reserved.
引用
收藏
页码:374 / 390
页数:17
相关论文
共 23 条
[1]
Solving the multi-mode resource-constrained project scheduling problem with genetic algorithms [J].
Alcaraz, J ;
Maroto, C ;
Ruiz, R .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2003, 54 (06) :614-626
[2]
Alvarez-Valdez R., 1989, Advances in Project Scheduling, P113
[3]
SOME EFFICIENT MULTI-HEURISTIC PROCEDURES FOR RESOURCE-CONSTRAINED PROJECT SCHEDULING [J].
BOCTOR, FF .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1990, 49 (01) :3-13
[4]
A new and efficient heuristic for scheduling projects with resource restrictions and multiple execution modes [J].
Boctor, FF .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1996, 90 (02) :349-361
[5]
HEURISTICS FOR SCHEDULING PROJECTS WITH RESOURCE RESTRICTIONS AND SEVERAL RESOURCE-DURATION MODES [J].
BOCTOR, FF .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1993, 31 (11) :2547-2558
[6]
Project scheduling under partially renewable resource constraints [J].
Böttcher, J ;
Drexl, A ;
Kolisch, R ;
Salewski, F .
MANAGEMENT SCIENCE, 1999, 45 (04) :543-559
[7]
A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version [J].
Bouleimen, K ;
Lecocq, H .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2003, 149 (02) :268-281
[8]
Resource-constrained project scheduling: Notation, classification, models, and methods [J].
Brucker, P ;
Drexl, A ;
Mohring, R ;
Neumann, K ;
Pesch, E .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1999, 112 (01) :3-41
[9]
BUDDHAKULSOMISI.J, IN PRESS EUROPEAN J
[10]
COMPARISON OF HEURISTIC AND OPTIMUM SOLUTIONS IN RESOURCE-CONSTRAINED PROJECT SCHEDULING [J].
DAVIS, EW ;
PATTERSON, JH .
MANAGEMENT SCIENCE SERIES B-APPLICATION, 1975, 21 (08) :944-955