Influence of capacity- and time-constrained intermediate storage in two-stage food production systems

被引:24
作者
Akkerman, Renzo [1 ]
van Donk, Dirk Pieter [1 ]
Gaalman, Gerard [1 ]
机构
[1] Univ Groningen, Fac Management & Org, Prod Syst Design Grp, Groningen, Netherlands
关键词
food processing; storage tanks; capacity constraints; time constraints; simulation;
D O I
10.1080/00207540600806463
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In food processing, two-stage production systems with a batch processor in the first stage and packaging lines in the second stage are common and mostly separated by capacity- and time-constrained intermediate storage. This combination of constraints is common in practice, but the literature hardly pays any attention to this. In this paper, we show how various capacity and time constraints influence the performance of a specific two-stage system. We study the effects of several basic scheduling and sequencing rules in the presence of these constraints in order to learn the characteristics of systems like this. Contrary to the common sense in operations management, the LPT rule is able to maximize the total production volume per day. Furthermore, we show that adding one tank has considerable effects. Finally, we conclude that the optimal setup frequency for batches in the first stage is dictated by the storage time constraint.
引用
收藏
页码:2955 / 2973
页数:19
相关论文
共 24 条
[1]  
AKKERMAN R, 2006, IN PRESS COGN TECHNO
[2]   THE SPT PRIORITY SEQUENCE RULE - THE ILLUSION OF EFFICIENCY AND THE REALITY OF BOTTLENECKS [J].
BASSETT, G ;
TODD, R .
INTERNATIONAL JOURNAL OF OPERATIONS & PRODUCTION MANAGEMENT, 1994, 14 (12) :70-78
[3]  
BELARBI K, 1992, PROD PLAN CONTROL, V7, P36
[4]  
Cox J.F., 2002, APICS Dictionary
[5]   SCHEDULES FOR A 2-STAGE HYBRID FLOWSHOP WITH PARALLEL MACHINES AT THE 2ND STAGE [J].
GUPTA, JND ;
TUNC, EA .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1991, 29 (07) :1489-1502
[6]   2-STAGE, HYBRID FLOWSHOP SCHEDULING PROBLEM [J].
GUPTA, JND .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1988, 39 (04) :359-364
[7]   A study on the performance of scheduling rules in buffer-constrained dynamic flowshops [J].
Holthaus, O ;
Rajendran, C .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2002, 40 (13) :3041-3052
[8]  
Johnson Selmer Martin., 1954, NAV RES LOG, V1, P61, DOI [10.1002/(ISSN)1931-9193, DOI 10.1002/NAV.3800010110, 10.1002/nav.3800010110]
[9]   A GENERAL ALGORITHM FOR SHORT-TERM SCHEDULING OF BATCH-OPERATIONS .1. MILP FORMULATION [J].
KONDILI, E ;
PANTELIDES, CC ;
SARGENT, RWH .
COMPUTERS & CHEMICAL ENGINEERING, 1993, 17 (02) :211-227
[10]   A hybrid two-stage flowshop with part family, batch production, major and minor set-ups [J].
Li, SL .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1997, 102 (01) :142-156