Multilevel lot sizing with setup times and multiple constrained resources: Internally rolling schedules with lot-sizing windows

被引:146
作者
Stadtler, H [1 ]
机构
[1] Tech Univ Darmstadt, Inst Betriebswirtschaftslehre, Fachgebiet Fertigungs & Mat Wirtschaft, D-64289 Darmstadt, Germany
关键词
D O I
10.1287/opre.51.3.487.14949
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
In this paper a new time-oriented decomposition heuristic is proposed to solve the dynamic multi-item multilevel lot-sizing problem in general product structures with single and multiple constrained resources as well as setup times. While lot-sizing decisions are made sequentially within an internally rolling planning interval (or lot-sizing window), capacities are always considered over the entire planning horizon. For each submodel a model formulation based on the "Simple Plant Location" representation is developed. These mixed-integer linear submodels are solved by standard mathematical programming software even for relatively large test instances. Extensive computational tests show that the heuristic proposed provides a better solution quality than a well-known special purpose heuristic.
引用
收藏
页码:487 / 502
页数:16
相关论文
共 29 条
[1]   A PARALLEL HEURISTIC ALGORITHM FOR LOT-SIZING IN MULTISTAGE PRODUCTION SYSTEMS [J].
AFENTAKIS, P .
IIE TRANSACTIONS, 1987, 19 (01) :34-42
[2]  
BILLINGTON P, 1983, MANAGE SCI, V32, P989
[3]   THE PERFORMANCE OF ROLLING PRODUCTION SCHEDULES IN A PROCESS INDUSTRY [J].
DEMATTA, R ;
GUIGNARD, M .
IIE TRANSACTIONS, 1995, 27 (05) :564-573
[4]   ON PRACTICAL RESOURCE-ALLOCATION FOR PRODUCTION PLANNING AND SCHEDULING WITH PERIOD OVERLAPPING SETUPS [J].
DILLENBERGER, C ;
ESCUDERO, LF ;
WOLLENSAK, A ;
WU, Z .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1994, 75 (02) :275-286
[5]   Lot sizing and scheduling - Survey and extensions [J].
Drexl, A ;
Kimms, A .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1997, 99 (02) :221-235
[6]   SOLVING MULTI-ITEM CAPACITATED LOT-SIZING PROBLEMS USING VARIABLE REDEFINITION [J].
EPPEN, GD ;
MARTIN, RK .
OPERATIONS RESEARCH, 1987, 35 (06) :832-848
[7]   THE DISCRETE LOT-SIZING AND SCHEDULING PROBLEM [J].
FLEISCHMANN, B .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1990, 44 (03) :337-348
[8]   Lot sizing in serial assembly systems with multiple constrained resources [J].
Harrison, TP ;
Lewis, HS .
MANAGEMENT SCIENCE, 1996, 42 (01) :19-36
[9]  
HEINRICH DE, 1986, MULTISTAGE PRODUCTIO, P150
[10]   Lot sizing in general assembly systems with setup costs, setup times, and multiple constrained resources [J].
Katok, E ;
Lewis, HS ;
Harrison, TP .
MANAGEMENT SCIENCE, 1998, 44 (06) :859-877