Analysis of construction projects by means of value curves

被引:19
作者
Ballesteros Perez, P. [2 ]
Gonzalez-Cruz, Ma C. [1 ]
Pastor-Ferrando, J. P. [1 ]
机构
[1] Univ Politecn Valencia, Escuela Tecn Super Ingenieros Ind, Valencia 46022, Spain
[2] Depurac Aguas Mediterraneo SL, Valencia 46005, Spain
关键词
Project; Construction; Strategy canvas; Value curve; Stakeholders; DESIGN; INNOVATION;
D O I
10.1016/j.ijproman.2009.11.003
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
The present work analyzes the expectations and relationships of the three key stakeholders involved in the construction project management process: the construction Promoter (the company that finances, owns and represents the interests of the client), the project designers (the company that elaborates the construction project) and the builder (the company that executes the construction project). In this article we propose an analysis of the project stakeholders' expectations using the strategy canvas tool (a graphical model that uses value curves as a way of measuring the evaluation of the key factors involved in the design of the construction project document). The analysis aims to provide evidence on the phases, characteristics and documents of the construction project design and management process better rated by the agents involved in the process. The analysis of the value curves will provide evidence on deficiencies in the elaboration of the construction project document and will allow us to propose some solutions for certain situations. The work presented is based on the answers supplied by 111 interviewed people belonging to the three agents mentioned above. (C) 2009 Elsevier Ltd and IPMA. All rights reserved.
引用
收藏
页码:719 / 731
页数:13
相关论文
共 28 条
[1]  
[Anonymous], PROCESO PROYECTO CON
[2]   A data flow model to plan and manage the building design process [J].
Austin, S ;
Baldwin, A ;
Newton, A .
JOURNAL OF ENGINEERING DESIGN, 1996, 7 (01) :3-25
[3]   Factors affecting the success of a construction project [J].
Chan, APC ;
Scott, D ;
Chan, APL .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2004, 130 (01) :153-155
[4]   Nature of engineering consulting projects [J].
Chang, AS ;
Chiu, SH .
JOURNAL OF MANAGEMENT IN ENGINEERING, 2005, 21 (04) :179-188
[5]  
Chinyio E.A., 1998, INT J PROJ MANAG, V16, P385, DOI DOI 10.1016/S0263-7863(98)00001-5
[6]   Downside risks in construction projects developed by the civil service:: The case of Spain [J].
de la Cruz, M. Pilar ;
del Cano, Alfredo ;
de la Cruz, Elisa .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2006, 132 (08) :844-852
[7]  
Drucker PeterF., 2001, ESSENTIAL DRUCKER BE
[8]  
Drucker PF, 2002, HARVARD BUS REV, V80, P95
[9]  
Fernandez A., 2005, CREATIVIDAD INNOVACI
[10]  
GARSDEN BR, 1994, J CONSTR ENG M ASCE, V121, P37