A review and classification of heuristics for permutation flow-shop scheduling with makespan objective

被引:187
作者
Framinan, JM
Gupta, JND
Leisten, R
机构
[1] Univ Seville, Seville, Spain
[2] Univ Alabama, Huntsville, AL 35899 USA
[3] Univ Duisburg Essen, Duisburg, Germany
关键词
scheduling; sequencing; heuristics; makespan;
D O I
10.1057/palgrave.jors.2601784
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Makespan minimization in permutation flow-shop scheduling is an operations research topic that has been intensively addressed during the last 40 years. Since the problem is known to be NP-hard for more than two machines, most of the research effort has been devoted to the development of heuristic procedures in order to provide good approximate solutions to the problem. However, little attention has been devoted to establish a common framework for these heuristics so that they can be effectively combined or extended. In this paper, we review and classify the main contributions regarding this topic and discuss future research issues.
引用
收藏
页码:1243 / 1255
页数:13
相关论文
共 76 条
[1]  
Aggarwal S. C., 1975, Decision Sciences, V6, P237, DOI 10.1111/j.1540-5915.1975.tb01016.x
[2]   SIMULATED VERSUS REAL LIFE DATA IN TESTING THE EFFICIENCY OF SCHEDULING ALGORITHMS [J].
AMAR, AD ;
GUPTA, JND .
IIE TRANSACTIONS, 1986, 18 (01) :16-25
[3]  
ASHOUR S, 1970, INT J PROD RES, V8, P281
[4]  
Ashour S, 1967, INT J PROD RES, V6, P109
[5]   A simple heuristic for m-machine flow-shop and its applications in routing-scheduling problems [J].
Averbakh, I ;
Berman, O .
OPERATIONS RESEARCH, 1999, 47 (01) :165-170
[6]   ANTITHETIC SEQUENCES IN FLOW-SHOP SCHEDULING [J].
AZIM, MA ;
MORAS, RG ;
SMITH, ML .
COMPUTERS & INDUSTRIAL ENGINEERING, 1989, 17 :353-358
[7]   NEW BOUND FOR MACHINE SCHEDULING [J].
BESTWICK, PF ;
HASTINGS, NAJ .
OPERATIONAL RESEARCH QUARTERLY, 1976, 27 (02) :479-487
[8]   SOLUTIONS TO CONSTRAINED FLOWSHOP SEQUENCING PROBLEM [J].
BONNEY, MC ;
GUNDRY, SW .
OPERATIONAL RESEARCH QUARTERLY, 1976, 27 (04) :869-883
[9]   JOHNSONS 3-MACHINE FLOW-SHOP CONJECTURE [J].
BURNS, F ;
ROOKER, J .
OPERATIONS RESEARCH, 1976, 24 (03) :578-580
[10]  
CAMPBELL HG, 1970, MANAGE SCI B-APPL, V16, pB630