A STATE-OF-ART SURVEY OF STATIC SCHEDULING RESEARCH INVOLVING DUE DATES

被引:70
作者
SEN, T
GUPTA, SK
机构
[1] FLORIDA INT UNIV, DEPT DECIS SCI, MIAMI, FL 33199 USA
[2] UNIV N CAROLINA, GREENSBORO, NC 27412 USA
来源
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE | 1984年 / 12卷 / 01期
关键词
D O I
10.1016/0305-0483(84)90011-2
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
引用
收藏
页码:63 / 76
页数:14
相关论文
共 122 条
[71]  
Lawler E. L., 1977, ANN DISCRETE MATH, V1, P331, DOI [10.1016/S0167-5060(08)70742-8, DOI 10.1016/S0167-5060(08)70742-8]
[72]   MINIMIZATION OF TIME-VARYING COSTS IN SINGLE-MACHINE SCHEDULING [J].
LAWLER, EL ;
SIVAZLIAN, BD .
OPERATIONS RESEARCH, 1978, 26 (04) :563-569
[73]   ON SCHEDULING PROBLEMS WITH DEFERRAL COSTS [J].
LAWLER, EL .
MANAGEMENT SCIENCE, 1964, 11 (02) :280-288
[74]   FUNCTIONAL EQUATION AND ITS APPLICATION TO RESOURCE ALLOCATION AND SEQUENCING PROBLEMS [J].
LAWLER, EL ;
MOORE, JM .
MANAGEMENT SCIENCE SERIES A-THEORY, 1969, 16 (01) :77-84
[75]   OPTIMAL SEQUENCING OF A SINGLE MACHINE SUBJECT TO PRECEDENCE CONSTRAINTS [J].
LAWLER, EL .
MANAGEMENT SCIENCE SERIES A-THEORY, 1973, 19 (05) :544-546
[76]  
LAWLER EL, 1981, MATH OPER RES, V6, P153, DOI 10.1287/moor.6.1.153
[77]   COMPLEXITY RESULTS FOR SCHEDULING CHAINS ON A SINGLE-MACHINE [J].
LENSTRA, JK ;
RINNOOYKAN, AHG .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1980, 4 (04) :270-275
[78]  
LENSTRA JK, 1976, THESIS MATH CENTRUM
[79]  
LOMINICKI ZA, 1965, OPERATIONAL RES Q, V16, P89
[80]   SEQUENCING NORMAL-JOBS ON ONE MACHINE TO MINIMIZE NUMBER OF LATE JOBS [J].
MAXWELL, WL .
MANAGEMENT SCIENCE SERIES A-THEORY, 1970, 16 (05) :295-297