HEURISTICS FOR SCHEDULING IN FLOWSHOP WITH MULTIPLE OBJECTIVES

被引:92
作者
RAJENDRAN, C
机构
[1] Division of Industrial Engineering and Management, Department of Humanities and Social Sciences, Indian Institute of Technology, Madras
关键词
FLOWSHOP SCHEDULING; HEURISTICS; MULTIPLE OBJECTIVES; MAKESPAN; FLOWTIME; MACHINE IDLETIME;
D O I
10.1016/0377-2217(93)E0212-G
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Most of the heuristics for flowshop scheduling aim at minimizing makespan. However, scheduling with multiple objectives, such as that of minimizing makespan, total flowtime and machine idletime, is more effective in reducing the total scheduling cost. In this article, we first address the problem of scheduling to minimize makespan and total flowtime, and propose a new heuristic algorithm. A heuristic preference relation is developed as the basis for the heuristic so that only the potential job interchanges are checked for possible improvement with respect to these two objectives. The proposed as well as the existing heuristics are evaluated in a large number of randomly generated large-sized problems. The proposed heuristic algorithm is then extended to cover the problem of scheduling to minimize makespan, total flowtime and machine idletime. The results of the experimental investigation of the evaluation of this heuristic algorithm and the existing heuristic in meeting these objectives are also reported. It is found that both the proposed heuristics are more effective than the existing one for scheduling with multiple objectives.
引用
收藏
页码:540 / 555
页数:16
相关论文
共 18 条
[1]  
Baker K., 1974, INTRO SEQUENCING SCH
[2]  
CAMPBELL HG, 1970, MANAGE SCI B-APPL, V16, pB630
[3]   EVALUATION OF FLOW SHOP SEQUENCING HEURISTICS [J].
DANNENBRING, DG .
MANAGEMENT SCIENCE, 1977, 23 (11) :1174-1182
[4]  
French S., 1982, SEQUENCING SCHEDULIN
[5]  
Garey M. R., 1976, Mathematics of Operations Research, V1, P117, DOI 10.1287/moor.1.2.117
[6]   A NEW HEURISTIC FOR THE N-JOB, M-MACHINE FLOWSHOP PROBLEM [J].
HO, JC ;
CHANG, YL .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1991, 52 (02) :194-202
[7]   AN EXTENSION OF PALMER HEURISTIC FOR THE FLOW-SHOP SCHEDULING PROBLEM [J].
HUNDAL, TS ;
RAJGOPAL, J .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1988, 26 (06) :1119-1124
[8]   APPLICATION OF BRANCH AND BOUND TECHNIQUE TO SOME FLOW-SHOP SCHEDULING PROBLEMS [J].
IGNALL, E ;
SCHRAGE, L .
OPERATIONS RESEARCH, 1965, 13 (03) :400-&
[9]  
Johnson SM, 1954, NAV RES LOGIST Q, V1, P61, DOI DOI 10.1002/NAV.3800010110
[10]   HEURISTICS FOR FLOWSHOP SCHEDULING [J].
KING, JR ;
SPACHIS, AS .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1980, 18 (03) :345-357