BATCHING DECISIONS - STRUCTURE AND MODELS

被引:105
作者
KUIK, R
SALOMON, M
VANWASSENHOVE, LN
机构
[1] ERASMUS UNIV ROTTERDAM,ROTTERDAM SCH MANAGEMENT,POB 1738,3000 DR ROTTERDAM,NETHERLANDS
[2] INSEAD,F-77305 FONTAINEBLEAU,FRANCE
关键词
BATCHING AND LOTSIZING; PLANNING AND CONTROL; MODELING; DECISION MAKING;
D O I
10.1016/0377-2217(94)90072-8
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Batching decisions are one of management's instruments to impact performance of goods-flow systems. There is a vast body of literature on analysis and modeling of batching. This paper aims to provide a structure for batching decisions that can help in positioning batching research and models with respect to issues pertinent to goods-flow management. The basis of the structure is a distinction of batching issues as related to three decision levels: (i) process choice/design, (ii) activity planning (aggregate planning and activity programming), and (iii) activity control. Furthermore, the paper discusses some often heard criticisms of batching analysis. The paper concludes with a little speculation of the authors on the future directions of batching research.
引用
收藏
页码:243 / 263
页数:21
相关论文
共 156 条
[1]   DECOMPOSITION PRINCIPLES APPLIED TO THE DYNAMIC PRODUCTION AND WORK-FORCE SCHEDULING PROBLEM [J].
AARDAL, K ;
ARI, A .
ENGINEERING COSTS AND PRODUCTION ECONOMICS, 1987, 12 (1-4) :39-49
[2]   SIMULTANEOUS LOT SIZING AND SEQUENCING FOR MULTISTAGE PRODUCTION SYSTEMS [J].
AFENTAKIS, P .
IIE TRANSACTIONS, 1985, 17 (04) :327-331
[3]   OPTIMAL LOT-SIZING ALGORITHMS FOR COMPLEX PRODUCT STRUCTURES [J].
AFENTAKIS, P ;
GAVISH, B .
OPERATIONS RESEARCH, 1986, 34 (02) :237-249
[4]   COMPUTATIONALLY EFFICIENT OPTIMAL-SOLUTIONS TO THE LOT-SIZING PROBLEM IN MULTISTAGE ASSEMBLY SYSTEMS [J].
AFENTAKIS, P ;
GAVISH, B ;
KARMARKAR, U .
MANAGEMENT SCIENCE, 1984, 30 (02) :222-239
[5]   IMPROVED ALGORITHMS FOR ECONOMIC LOT-SIZE PROBLEMS [J].
AGGARWAL, A ;
PARK, JK .
OPERATIONS RESEARCH, 1993, 41 (03) :549-571
[6]  
AKSOY Y, 1988, INT J PROD RES, V22, P923
[7]   TESTING FEASIBILITY IN A LOT SCHEDULING PROBLEM [J].
ANDERSON, EJ .
OPERATIONS RESEARCH, 1990, 38 (06) :1079-1088
[8]  
[Anonymous], [No title captured]
[9]  
Anthony RobertNewton, 1965, PLANNING CONTROL SYS
[10]   COMPUTATIONAL-COMPLEXITY OF UNCAPACITATED MULTI-ECHELON PRODUCTION PLANNING PROBLEMS [J].
ARKIN, E ;
JONEJA, D ;
ROUNDY, R .
OPERATIONS RESEARCH LETTERS, 1989, 8 (02) :61-66