BATCHING DECISIONS - STRUCTURE AND MODELS

被引:105
作者
KUIK, R
SALOMON, M
VANWASSENHOVE, LN
机构
[1] ERASMUS UNIV ROTTERDAM,ROTTERDAM SCH MANAGEMENT,POB 1738,3000 DR ROTTERDAM,NETHERLANDS
[2] INSEAD,F-77305 FONTAINEBLEAU,FRANCE
关键词
BATCHING AND LOTSIZING; PLANNING AND CONTROL; MODELING; DECISION MAKING;
D O I
10.1016/0377-2217(94)90072-8
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Batching decisions are one of management's instruments to impact performance of goods-flow systems. There is a vast body of literature on analysis and modeling of batching. This paper aims to provide a structure for batching decisions that can help in positioning batching research and models with respect to issues pertinent to goods-flow management. The basis of the structure is a distinction of batching issues as related to three decision levels: (i) process choice/design, (ii) activity planning (aggregate planning and activity programming), and (iii) activity control. Furthermore, the paper discusses some often heard criticisms of batching analysis. The paper concludes with a little speculation of the authors on the future directions of batching research.
引用
收藏
页码:243 / 263
页数:21
相关论文
共 156 条
[61]   THE DISCRETE LOT-SIZING AND SCHEDULING PROBLEM WITH SEQUENCE-DEPENDENT SETUP COSTS [J].
FLEISCHMANN, B .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1994, 75 (02) :395-404
[62]  
Forrester JW., 1961, IND DYNAMICS
[63]   A DYNAMIC-PROGRAMMING SOLUTION TO THE DYNAMIC, MULTI-ITEM, SINGLE-MACHINE SCHEDULING PROBLEM [J].
GASCON, A ;
LEACHMAN, RC .
OPERATIONS RESEARCH, 1988, 36 (01) :50-56
[64]   A FULLY POLYNOMIAL-APPROXIMATION SCHEME FOR SINGLE-PRODUCT SCHEDULING IN A FINITE-CAPACITY FACILITY [J].
GAVISH, B ;
JOHNSON, RE .
OPERATIONS RESEARCH, 1990, 38 (01) :70-83
[65]   FEASIBILITY OF SCHEDULING LOT SIZES OF 3 PRODUCTS ON ONE MACHINE [J].
GLASS, CA .
MANAGEMENT SCIENCE, 1992, 38 (10) :1482-1494
[66]  
GLASS CA, 1992, EUROPEAN J OPERATION, V75, P378
[67]  
GLASS CA, 1994, EUROPEAN J OPERATION
[68]   ECONOMIC MANUFACTURING QUANTITY IN A JUST-IN-TIME DELIVERY SYSTEM [J].
GOLHAR, DY ;
SARKER, BR .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1992, 30 (05) :961-972
[69]   INTEGRATED PROCUREMENT PRODUCTION SYSTEMS - A REVIEW [J].
GOYAL, SK ;
DESHMUKH, SG .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1992, 62 (01) :1-10
[70]   THE MULTI-PRODUCT PRODUCTION CYCLING PROBLEM [J].
GRAVES, SC .
AIIE TRANSACTIONS, 1980, 12 (03) :233-240