MULTIPROJECT STAFF SCHEDULING WITH VARIABLE RESOURCE CONSTRAINTS

被引:21
作者
DEAN, BV [1 ]
DENZLER, DR [1 ]
WATKINS, JJ [1 ]
机构
[1] DEPT HLTH SERV,SACRAMENTO,CA 94234
关键词
D O I
10.1109/17.119663
中图分类号
F [经济];
学科分类号
02 ;
摘要
This paper presents an analytical approach and a PC software based solution to a project management problem, in which multiple resources must be allocated to perform both routine tasks and a set of projects with varying levels of priority. The performance of a priority-based decision rule was tested on this project management problem. The model was able to provide division-level management with an effective tool for staff workload planning and program management. A sequential, iterative approach is developed and used to test and evaluate alternative PC commercial software on a set of projects and evolving criteria. A PC commercial software package, with associated heuristics, is demonstrated to provide useful results to multiproject staff scheduling problems in an actual organization.
引用
收藏
页码:59 / 72
页数:14
相关论文
共 28 条
[21]   A COMPARISON OF EXACT APPROACHES FOR SOLVING THE MULTIPLE CONSTRAINED RESOURCE, PROJECT SCHEDULING PROBLEM [J].
PATTERSON, JH .
MANAGEMENT SCIENCE, 1984, 30 (07) :854-867
[22]  
RIIS J, 1987, INT J PROJECT MANAGE, V5, P91
[23]  
STINSON JP, 1976, THESIS U N CAROLINA
[24]  
TALBOT BF, 1976, THESIS U PARK PA
[25]   PROJECT-MANAGEMENT ON THE PC - SOFTWARE, APPLICATIONS, AND TRENDS [J].
WASIL, EA ;
ASSAD, AA .
INTERFACES, 1988, 18 (02) :75-84
[26]  
WIEST JD, 1967, MANAGE SCI, V13, pB339
[27]  
WIEST JD, 1976, MANAGEMENT GUIDE PER
[28]  
[No title captured]