SIMULATION STUDIES IN JOB SHOP SCHEDULING .2. PERFORMANCE OF PRIORITY RULES

被引:16
作者
KIRAN, AS [1 ]
SMITH, ML [1 ]
机构
[1] TEXAS TECH UNIV,DEPT IND ENGN,LUBBOCK,TX 79409
关键词
D O I
10.1016/0360-8352(84)90002-0
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
引用
收藏
页码:95 / 105
页数:11
相关论文
共 31 条
[11]  
DAY JE, 1975, INT J PROD RES, V13, P603
[12]  
DEANE RH, 1972, AIIE T, V4, P227
[13]  
DUDEK RA, 1976, SCHEDULING WORK CTR
[14]  
Eilon S., 1976, International Journal of Production Research, V14, P223, DOI 10.1080/00207547608956596
[15]  
EILON S, 1968, INT J PROD RES, V7, P135, DOI DOI 10.1080/00207546808929803
[16]  
Eilon S, 1967, INT J PROD RES, V6, P1
[17]  
Elvers D. A., 1974, AIIE T, V6, P41
[18]  
ELVERS DA, 1973, J AM PRODUCTION INVE, V14, P62
[19]  
GERE WS, 1966, MANAGEMENT SCI, V13
[20]   A SIMULATION STUDY OF SEQUENCING IN BATCH PRODUCTION [J].
HOLLIER, RH .
OPERATIONAL RESEARCH QUARTERLY, 1968, 19 (04) :389-&