共 31 条
[21]
JOB SHOP SCHEDULING WITH DUE DATES AND VARIABLE PROCESSING TIMES
[J].
MANAGEMENT SCIENCE SERIES A-THEORY,
1974, 20 (09)
:1264-1275
[22]
HOTTENSTEIN MP, 1970, AIIE T, V2, P46
[23]
Irastorza J. C., 1974, AIIE Transactions, V6, P302, DOI 10.1080/05695557408974968
[24]
ECONOMIC EVALUATION OF JOB SHOP DISPATCHING RULES
[J].
MANAGEMENT SCIENCE SERIES A-THEORY,
1973, 20 (03)
:293-307
[26]
NELSON RT, 1977, AIIE T, V9
[27]
OLDZIEY JW, 1966, THESIS CORNELL U
[28]
Oral M., 1973, AIIE Transactions, V5, P357, DOI 10.1080/05695557308974923
[29]
PANWALKAR SS, 1976, ORSA TIMS SPECIAL IN
[30]
SHUE L, 1978, J CHINESE INSTIT ENG, V1, P75