DETERMINATION OF RELIABILITY WORTH FOR DISTRIBUTION-SYSTEM PLANNING

被引:43
作者
GOEL, L [1 ]
BILLINTON, R [1 ]
机构
[1] UNIV SASKATCHEWAN,DEPT ELECT ENGN,POWER SYST RES GRP,SASKATOON S7N 0W0,SASKATCHEWAN,CANADA
关键词
CUSTOMER INTERRUPTION COSTS; INTERRUPTED ENERGY ASSESSMENT RATE; COST WORTH ANALYSIS; VALUE-BASED RELIABILITY;
D O I
10.1109/61.311207
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
There is an ever growing demand to justify reliability projects on a more quatifiable basis, i.e. investments related to the provision of service reliability needs to be carefully evaluated in regard to their cost and benefit implications. In addition, utilities are recognizing the significant customer and community costs that are incurred when electric supply is abruptly curtailed. Consequently, the utility industry is under pressure to assess their reliability evaluation tools and formulate methods for incorporating the economics of reliability in the decision-making process. This paper is concerned with the evaluation of a reliability worth index that can be used to make decisions in distribution system planning and design. The reliability worth index is termed the interrupted energy assessment rate (IEAR) and is obtained by relating the reliability indices to the customer cost of interruption data. Three fundamentally different approaches for evaluating distribution system reliability worth indices are presented and compared using a small but comprehensive test system. The impact on the worth indices of distribution system operating policies and configurations is also illustrated using the three methods. The worth indices developed can be used to determine the monetary implications of customer supply interruptions thereby incorporating economics in the reliability cost-benefit equation.
引用
收藏
页码:1577 / 1583
页数:7
相关论文
共 14 条
[1]   A RELIABILITY TEST SYSTEM FOR EDUCATIONAL PURPOSES - BASIC DISTRIBUTION-SYSTEM DATA AND RESULTS [J].
ALLAN, RN ;
BILLINTON, R ;
SJARIEF, I ;
GOEL, L ;
SO, KS .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1991, 6 (02) :813-820
[2]   COMPARISON OF 2 ALTERNATE METHODS TO ESTABLISH AN INTERRUPTED ENERGY ASSESSMENT RATE [J].
BILLINTON, R ;
OTENGADJEI, J ;
GHAJAR, R .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1987, 2 (03) :751-757
[3]   A RELIABILITY TEST SYSTEM FOR EDUCATIONAL PURPOSES - BASIC DATA [J].
BILLINTON, R ;
KUMAR, S ;
CHOWDHURY, N ;
CHU, K ;
DEBNATH, K ;
GOEL, L ;
KHAN, E ;
KOS, P ;
NOURBAKHSH, G ;
OTENGADJEI, J .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1989, 4 (03) :1238-1244
[4]  
Billinton R., 1988, RELIABILITY ASSESSME
[5]  
Billinton R., 1984, RELIABILITY ASSESSME
[6]   VALUE OF SERVICE RELIABILITY [J].
BURNS, S ;
GROSS, G .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1990, 5 (03) :825-834
[7]   EVALUATION OF INTERRUPTED ENERGY ASSESSMENT RATES IN DISTRIBUTION-SYSTEMS [J].
GOEL, L ;
BILLINTON, R .
IEEE TRANSACTIONS ON POWER DELIVERY, 1991, 6 (04) :1876-1882
[8]   A PROCEDURE FOR EVALUATING INTERRUPTED ENERGY ASSESSMENT RATES IN AN OVERALL ELECTRIC-POWER SYSTEM [J].
GOEL, L ;
BILLINTON, R .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1991, 6 (04) :1396-1403
[9]  
GOEL L, 1992, JUL IEEE SUMM M SEAT
[10]   EVALUATION OF INTERRUPTED ENERGY ASSESSMENT RATES IN COMPOSITE SYSTEMS [J].
OTENGADJEI, J ;
BILLINTON, R .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1990, 5 (04) :1317-1323