A GOAL APPROACH TO ASSEMBLY LINE BALANCING

被引:27
作者
DECKRO, RF [1 ]
RANGACHARI, S [1 ]
机构
[1] LEGATO SYST,TECH STAFF,PALO ALTO,CA 94306
关键词
D O I
10.1016/0305-0548(90)90055-C
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
A zero-one goal programming model for the assembly line balancing problem is developed. The goal model provides increased flexibility in constructing line balances by simultaneously considering varying operational requirements, such as zoning, sequencing, idle time, cycle time and costs. A sensitivity analysis of an example model highlights the usefulness of the approach in the planning stages of a line balance development. © 1990.
引用
收藏
页码:509 / 521
页数:13
相关论文
共 23 条
[11]  
Lawrence K. D., 1976, International Journal of Production Research, V14, P215, DOI 10.1080/00207547608956595
[12]  
Lee S.M., 1972, GOAL PROGRAMMING DEC, V1st
[13]   GOAL PROGRAMMING APPROACH TO MULTI-PERIOD PRODUCTION LINE SCHEDULING [J].
LEE, SM ;
CLAYTON, ER ;
TAYLOR, BW .
COMPUTERS & OPERATIONS RESEARCH, 1978, 5 (03) :205-211
[14]   DUALITY AND TRANSFORMATIONS IN MULTIPHASE AND SEQUENTIAL LINEAR GOAL PROGRAMMING [J].
MARKOWSKI, CA ;
IGNIZIO, JP .
COMPUTERS & OPERATIONS RESEARCH, 1983, 10 (04) :321-333
[15]   ANALYSIS OF A TRANSSHIPMENT PROBLEM WITH MULTIPLE CONFLICTING OBJECTIVES [J].
MOORE, LJ ;
TAYLOR, BW ;
LEE, SM .
COMPUTERS & OPERATIONS RESEARCH, 1978, 5 (01) :39-46
[16]  
NAUSS RM, 1972, PARAMETRIC INTEGER P
[17]   ASSEMBLY-LINE BALANCING - ZERO-ONE PROGRAMMING WITH FIBONACCI SEARCH [J].
PATTERSON, JH ;
ALBRACHT, JJ .
OPERATIONS RESEARCH, 1975, 23 (01) :166-172
[18]  
RANGACHARI S, 1984, ASSEMBLY LINE BALANC
[19]   A SURVEY OF GENERALIZED GOAL PROGRAMMING (1970-1982) [J].
ROMERO, C .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1986, 25 (02) :183-191
[20]  
Salveson M.E., 1955, J IND ENG, V6, P18, DOI [10.1115/1.4014559, DOI 10.1115/1.4014559]