COMPLETION TIMES IN SERIAL MIXED-STORAGE MULTIPRODUCT PROCESSES WITH TRANSFER AND SET-UP TIMES

被引:34
作者
RAJAGOPALAN, D [1 ]
KARIMI, IA [1 ]
机构
[1] NORTHWESTERN UNIV,DEPT CHEM,EVANSTON,IL 60208
关键词
D O I
10.1016/0098-1354(89)89016-7
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
引用
收藏
页码:175 / 186
页数:12
相关论文
共 11 条
[1]   A REVIEW OF PRODUCTION SCHEDULING [J].
GRAVES, SC .
OPERATIONS RESEARCH, 1981, 29 (04) :646-675
[2]   FLOWSHOP SCHEDULES WITH SEQUENCE DEPENDENT SETUP TIMES [J].
GUPTA, JND .
JOURNAL OF THE OPERATIONS RESEARCH SOCIETY OF JAPAN, 1986, 29 (03) :206-219
[3]  
Johnson SM, 1954, NAV RES LOGIST Q, V1, P61, DOI DOI 10.1002/NAV.3800010110
[4]   SEQUENCING A GENERALIZED TWO-STAGE FLOWSHOP WITH FINITE INTERMEDIATE STORAGE. [J].
Knopf, F.Carl .
Computers and Chemical Engineering, 1985, 9 (03) :207-221
[5]  
KU HM, 1987, NOV AICHE ANN M NEW
[6]  
KU HM, 1987, CHEM ENG PROG AUG
[7]  
RAJAGOPALAN D, 1987, 1987 P F COMP AID PR
[8]  
RAJAGOPALAN D, 1987, TR8703 NW U CTR MAN
[9]   FLOW-SHOP SEQUENCING PROBLEM WITH NO WAIT IN PROCESS [J].
REDDI, SS ;
RAMAMOORTHY, CV .
OPERATIONAL RESEARCH QUARTERLY, 1972, 23 (03) :323-+
[10]   FLOWSHOP PROBLEMS WITH TIME LAGS [J].
SZWARC, W .
MANAGEMENT SCIENCE, 1983, 29 (04) :477-481