Capacity guaranteed control method for air conditioning cluster joining power grid frequency regulation

被引:5
作者
Li, Zihao [1 ]
Wu, Wenchuan [1 ]
Zhang, Boming [1 ]
Tai, Xue [1 ]
机构
[1] Tsinghua Univ, Dept Elect Engn, Beijing, Peoples R China
来源
JOURNAL OF ENGINEERING-JOE | 2018年 / 2018卷 / 17期
关键词
frequency control; load regulation; power grids; search problems; air conditioning; AC aggregations; load frequency control; air conditioning cluster; power grid frequency regulation; heuristic simulated search algorithm; virtual power plant; primary frequency control; secondary frequency control; houses; buildings; secondary frequency regulation service; AC cluster;
D O I
10.1049/joe.2018.8348
中图分类号
T [工业技术];
学科分类号
08 [工学];
摘要
For the thermal inertia of houses and buildings, air conditioning (AC) cluster shows the potential in load frequency control. In this study, the authors propose a complete control framework for friendly accepting ACs to participate in secondary frequency regulation service without causing discomfort. An aggregator is hired to continually estimate the regulation capacity of ACs cluster by a heuristic simulated search algorithm, which could be guaranteed in a given duration. The external characteristics of the AC aggregations are set like a virtual power plant, which takes a droop curve for primary frequency control and a translation character for secondary frequency control. Simulation shows the capability for AC aggregations in load frequency control.
引用
收藏
页码:1884 / 1888
页数:5
相关论文
共 18 条
[1]
Contingency-Type Reserve Leveraged Through Aggregated Thermostatically-Controlled Loads-Part I: Characterization and Control [J].
Abiri-Jahromi, Amir ;
Bouffard, Francois .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2016, 31 (03) :1972-1980
[2]
Modeling and Control of Aggregate Air Conditioning Loads for Robust Renewable Power Management [J].
Bashash, Saeid ;
Fathy, Hosam K. .
IEEE TRANSACTIONS ON CONTROL SYSTEMS TECHNOLOGY, 2013, 21 (04) :1318-1327
[3]
Optimal Joint Energy and Secondary Regulation Reserve Hourly Scheduling of Variable Speed Pumped Storage Hydropower Plants [J].
Chazarra, Manuel ;
Ignacio Perez-Diaz, Juan ;
Garcia-Gonzalez, Javier .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2018, 33 (01) :103-115
[4]
Contreras-Mendieta J. Antonio, 2018, IMPLEMENT VIRTUAL WO, P1
[5]
Hao H, 2013, ANN ALLERTON CONF, P551, DOI 10.1109/Allerton.2013.6736573
[6]
Aggregate Flexibility of Thermostatically Controlled Loads [J].
Hao, He ;
Sanandaji, Borhan M. ;
Poolla, Kameshwar ;
Vincent, Tyrone L. .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2015, 30 (01) :189-198
[7]
Ancillary Service to the Grid Through Control of Fans in Commercial Building HVAC Systems [J].
Hao, He ;
Lin, Yashen ;
Kowli, Anupama S. ;
Barooah, Prabir ;
Meyn, Sean .
IEEE TRANSACTIONS ON SMART GRID, 2014, 5 (04) :2066-2074
[8]
A Closed-Loop Control Strategy for Air Conditioning Loads to Participate in Demand Response [J].
Hu, Xiaoqing ;
Wang, Beibei ;
Yang, Shengchun ;
Short, Taylor ;
Zhou, Lei .
ENERGIES, 2015, 8 (08) :8650-8681
[9]
Technologies and Magnitude of Ancillary Services Provided by Commercial Buildings [J].
Kim, Young-Jin ;
Blum, David H. ;
Xu, Nora ;
Su, Leo ;
Norford, Leslie K. .
PROCEEDINGS OF THE IEEE, 2016, 104 (04) :758-779
[10]
Kundur P., 1994, POWER SYSTEM STABILI