PART DISPATCH IN RANDOM YIELD MULTISTAGE FLEXIBLE TEST SYSTEMS FOR PRINTED-CIRCUIT BOARDS

被引:16
作者
AKELLA, R
RAJAGOPALAN, S
SINGH, MR
机构
[1] UNIV MICHIGAN,DEPT IND & OPERAT ENGN,ANN ARBOR,MI 48109
[2] UNIV SO CALIF,SCH BUSINESS,LOS ANGELES,CA 90089
关键词
D O I
10.1287/opre.40.4.776
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper concerns dynamic part dispatch decisions in electronic test systems with random yield. A discrete time, multiproduct, miltistage production system is used as a model for the test system with the objective to minimize the sum of inventory holding, backlogging, and overtime costs over a finite horizon. Exact results for such systems have been limited to either single-stage, multiple time period, or multistage, single time period problems with a single product. Here we develop two approximate policies: the linear decision rule, and the myopic resource allocation. The effectiveness of the two policies is evaluated through simulation under different operating conditions representative of those encountered in IBM and Tandem Computer facilities. The extensive computational study clearly demonstrates the overall superiority of the linear decision rule.
引用
收藏
页码:776 / 789
页数:14
相关论文
共 18 条
[1]   EFFICIENT COMPUTATION OF COORDINATING CONTROLS IN HIERARCHICAL STRUCTURES FOR FAILURE-PRONE MULTICELL FLEXIBLE ASSEMBLY SYSTEMS [J].
AKELLA, R ;
KROGH, BH ;
SINGH, MR .
IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION, 1990, 6 (06) :659-672
[2]   PERFORMANCE OF HIERARCHICAL PRODUCTION SCHEDULING POLICY [J].
AKELLA, R ;
CHOONG, Y ;
GERSHWIN, SB .
IEEE TRANSACTIONS ON COMPONENTS HYBRIDS AND MANUFACTURING TECHNOLOGY, 1984, 7 (03) :225-240
[3]   OPTIMAL-CONTROL OF PRODUCTION-RATE IN A FAILURE PRONE MANUFACTURING SYSTEM [J].
AKELLA, R ;
KUMAR, PR .
IEEE TRANSACTIONS ON AUTOMATIC CONTROL, 1986, 31 (02) :116-126
[4]   MULTIPRODUCT QUEUING-NETWORKS WITH DETERMINISTIC ROUTING - DECOMPOSITION APPROACH AND THE NOTION OF INTERFERENCE [J].
BITRAN, GR ;
TIRUPATI, D .
MANAGEMENT SCIENCE, 1988, 34 (01) :75-100
[5]   PERIODIC REVIEW PRODUCTION MODELS WITH VARIABLE YIELD AND UNCERTAIN DEMAND [J].
GERCHAK, Y ;
VICKSON, RG ;
PARLAR, M .
IIE TRANSACTIONS, 1988, 20 (02) :144-150
[6]   SHORT-TERM PRODUCTION SCHEDULING OF AN AUTOMATED MANUFACTURING FACILITY [J].
GERSHWIN, SB ;
AKELLA, R ;
CHOONG, YF .
IBM JOURNAL OF RESEARCH AND DEVELOPMENT, 1985, 29 (04) :392-400
[7]   USING LAGRANGEAN TECHNIQUES TO SOLVE HIERARCHICAL PRODUCTION PLANNING PROBLEMS [J].
GRAVES, SC .
MANAGEMENT SCIENCE, 1982, 28 (03) :260-275
[8]  
Hax AC, 1984, PRODUCTION INVENTORY
[9]  
Holt C.C., 1960, PLANNING PRODUCTION
[10]  
KARMARKAR US, 1986, QM8632 U ROCH WE SIM