A heuristic approach for big bucket multi-level production planning problems

被引:80
作者
Akartunali, Kerem [1 ]
Miller, Andrew J. [1 ]
机构
[1] Univ Wisconsin, Madison, WI 53706 USA
基金
美国国家科学基金会;
关键词
Integer programming; Production planning; Heuristics; Relax-and-fix; Strong formulations; LOT-SIZING PROBLEMS; SETUP TIMES; ALGORITHMS; COSTS; SYSTEMS; MODELS;
D O I
10.1016/j.ejor.2007.11.033
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Multi-level production planning problems in which multiple items compete for the same resources frequently occur in practice, yet remain daunting in their difficulty to solve. In this paper, we propose a heuristic framework that can generate high quality feasible solutions quickly for various kinds of lot-sizing problems. In addition, unlike many other heuristics, it generates high quality lower bounds using strong formulations, and its simple scheme allows it to be easily implemented in the Xpress-Mosel modeling language. Extensive computational results from widely used test sets that include a variety of problems demonstrate the efficiency of the heuristic, particularly for challenging problems. (C) 2007 Elsevier B.V. All rights reserved.
引用
收藏
页码:396 / 411
页数:16
相关论文
共 42 条
[31]  
Pochet Y, 2006, SPRING S OPERAT RES, DOI 10.1007/0-387-33477-7.
[32]   VALID INEQUALITIES AND PROJECTING THE MULTICOMMODITY EXTENDED FORMULATION FOR INCAPACITATED FIXED CHARGE NETWORK FLOW PROBLEMS [J].
RARDIN, RL ;
WOLSEY, LA .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1993, 71 (01) :95-109
[33]   Modeling multiple stage manufacturing systems with generalized costs and capacity issues [J].
Simpson, NC ;
Erenguc, SS .
NAVAL RESEARCH LOGISTICS, 2005, 52 (06) :560-570
[34]   Multilevel lot sizing with setup times and multiple constrained resources: Internally rolling schedules with lot-sizing windows [J].
Stadtler, H .
OPERATIONS RESEARCH, 2003, 51 (03) :487-502
[35]   A Lagrangean-based heuristic for dynamic multilevel multiitem constrained lotsizing with setup times [J].
Tempelmeier, H ;
Derstroff, M .
MANAGEMENT SCIENCE, 1996, 42 (05) :738-757
[36]   CAPACITATED LOT SIZING WITH SETUP TIMES [J].
TRIGEIRO, WW ;
THOMAS, LJ ;
MCCLAIN, JO .
MANAGEMENT SCIENCE, 1989, 35 (03) :353-366
[37]   Approximate extended formulations [J].
Van Vyve, M ;
Wolsey, LA .
MATHEMATICAL PROGRAMMING, 2006, 105 (2-3) :501-522
[38]   An O(T-3) algorithm for the economic lot-sizing problem with constant capacities [J].
vanHoesel, CPM ;
Wagelmans, APM .
MANAGEMENT SCIENCE, 1996, 42 (01) :142-150
[39]   DYNAMIC VERSION OF THE ECONOMIC LOT SIZE MODEL [J].
WAGNER, HM ;
WHITIN, TM .
MANAGEMENT SCIENCE, 1958, 5 (01) :89-96
[40]   Solving multi-item lot-sizing problems with an MIP solver using classification and reformulation [J].
Wolsey, LA .
MANAGEMENT SCIENCE, 2002, 48 (12) :1587-1602