An optimal batch size for a JIT manufacturing system

被引:43
作者
Khan, LR
Sarker, RA
机构
[1] Victoria Univ Technol, Sch Commun & Informat, Melbourne, Vic 8001, Australia
[2] Univ New S Wales, Sch Comp Sci, Canberra, ACT 2600, Australia
关键词
inventory control; materials procurement; JIT; periodic delivery; optimum order quantity;
D O I
10.1016/S0360-8352(02)00009-8
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This paper addresses the problem of a manufacturing system that procures raw materials from suppliers in a lot and processes them to convert to finished products. It proposes an ordering policy for raw materials to meet the requirements of a production facility. In turn, this facility must deliver finished products demanded by outside buyers at fixed interval points in time. In this paper, first we estimate production batch sizes for a JIT delivery system and then we incorporate a JIT raw material supply system. A simple algorithm is developed to compute the batch sizes for both manufacturing and raw material purchasing policies. Computational experiences of the problem are also briefly discussed. (C) 2002 Elsevier Science Ltd. All rights reserved.
引用
收藏
页码:127 / 136
页数:10
相关论文
共 17 条
[1]   JOINT VENDOR BUYER POLICY IN JIT MANUFACTURING [J].
ADEROHUNMU, R ;
MOBOLURIN, A ;
BRYSON, N .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1995, 46 (03) :375-385
[2]  
ANSARI A, 1987, J PURCHASING MAT MAN, V23, P24
[3]  
ANSARI A, 1987, PROD INVENTORY MGMT, V28, P32
[4]   OPERATIONAL ECONOMIES OF A PROCESS POSITIONING DETERMINANT [J].
CHAKRAVARTY, AK ;
MARTIN, GE .
COMPUTERS & OPERATIONS RESEARCH, 1991, 18 (06) :515-530
[5]   SUPPLIER CUSTOMER INVENTORY RELATIONSHIPS UNDER JUST IN TIME [J].
CHAPMAN, SN ;
CARTER, PL .
DECISION SCIENCES, 1990, 21 (01) :35-51
[6]   ECONOMIC MANUFACTURING QUANTITY IN A JUST-IN-TIME DELIVERY SYSTEM [J].
GOLHAR, DY ;
SARKER, BR .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1992, 30 (05) :961-972
[7]   AN OPTIMAL BATCH SIZE FOR A PRODUCTION SYSTEM OPERATING UNDER A JUST-IN-TIME DELIVERY SYSTEM [J].
JAMAL, AMM ;
SARKER, BR .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1993, 32 (02) :255-260
[8]  
MOINZADEH K, 1990, TIMS ORSA JOINT NAT
[9]  
ONEAL CR, 1989, J PURCH MATER MANAGE, V25, P34
[10]   A STEPWISE PARTIAL ENUMERATION ALGORITHM FOR THE ECONOMIC LOT SCHEDULING PROBLEM [J].
PARK, KS ;
YUN, DK .
IIE TRANSACTIONS, 1984, 16 (04) :363-370