Mathematical relationships between scoring parameters in capped tendering

被引:26
作者
Ballesteros-Perez, P. [2 ,3 ]
Gonzalez-Cruz, Ma C. [1 ]
Canavate-Grimal, A. [4 ]
机构
[1] Univ Politecn Valencia, Escuela Tecn Super Ingn Ind, Dept Proyectos Ingn, Valencia 46022, Spain
[2] Depurac Aguas Mediterraneo SL, Valencia 46980, Spain
[3] Univ Politecn Valencia, Escuela Tecn Super Ingn Caminos, Dept Ingn Terreno, Valencia 46022, Spain
[4] Univ CEU San Pablo, ESET, Dept Ingn Edificac & Prod Ind, Valencia 46115, Spain
关键词
Bid; Tender; Auction; Construction; Scoring system; OPPORTUNISTIC BIDDING BEHAVIOR; CONTRACTORS DECISION; COST; MODEL;
D O I
10.1016/j.ijproman.2012.01.008
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Mathematical relationships between Scoring Parameters can be used in Economic Scoring Formulas (ESF) in tendering to distribute the score among bidders in the economic part of a proposal. Each contracting authority must set an ESF when publishing tender specifications and the strategy of each bidder will differ depending on the ESF selected and the weight of the overall proposal scoring. This paper introduces the various mathematical relationships and density distributions that describe and inter-relate not only the main Scoring Parameters but the main Forecasting Parameters in any capped tender (those whose price is upper-limited). Forecasting Parameters, as variables that can be known in advance before the deadline of a tender is reached, together with Scoring Parameters constitute the basis of a future Bid Tender Forecasting Model. (C) 2012 Elsevier Ltd. APM and IPMA. All rights reserved.
引用
收藏
页码:850 / 862
页数:13
相关论文
共 48 条
  • [1] The iso-Score Curve Graph. A new tool for competitive bidding
    Ballesteros-Perez, P.
    Gonzalez-Cruz, Ma. C.
    Pastor-Ferrando, J. P.
    Fernandez-Diego, M.
    [J]. AUTOMATION IN CONSTRUCTION, 2012, 22 : 481 - 490
  • [2] Ballesteros-Perez P., 2010, THESIS
  • [3] Competitor analysis in construction bidding
    Bee-Lan, O. O.
    Drew, Derek S.
    Runeson, Goran
    [J]. CONSTRUCTION MANAGEMENT AND ECONOMICS, 2010, 28 (12) : 1321 - 1329
  • [4] Bee-Lan Oo, 2008, International Journal of Project Management, V26, P439, DOI 10.1016/j.ijproman.2007.06.001
  • [5] Carr R.I., 1982, P AM SOC CIVIL ENG, V108, P639
  • [6] Defining cost/schedule performance indices and their ranges for design projects
    Chang, AST
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2001, 17 (02) : 122 - 130
  • [7] Risk-minimizing approach to bid-cutting limit determination
    Chao, Li-Chung
    Liou, Chang-Nan
    [J]. CONSTRUCTION MANAGEMENT AND ECONOMICS, 2007, 25 (08) : 835 - 843
  • [8] Naive bidding
    Deltas, G
    Engelbrecht-Wiggans, R
    [J]. MANAGEMENT SCIENCE, 2005, 51 (03) : 328 - 338
  • [9] A case-based decision support tool for bid mark-up estimation of international construction projects
    Dikmen, Irem
    Birgonul, M. Talat
    Gur, A. Kemal
    [J]. AUTOMATION IN CONSTRUCTION, 2007, 17 (01) : 30 - 44
  • [10] The effect of contract type and size on competitiveness in bidding
    Drew, Derek
    Skitmore, Martin
    [J]. 1997, Routledge (15)