Optimal batch size and raw material ordering policy for a production system with a fixed-interval, lumpy demand delivery system

被引:57
作者
Sarker, BR [1 ]
Parija, GR [1 ]
机构
[1] IBM CORP,OSL RES GRP,POUGHKEEPSIE,NY 12601
关键词
production-delivery system; lumpy demand; economic manufacturing quantity;
D O I
10.1016/0377-2217(94)00277-0
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
The paper develops an ordering policy for raw materials, to meet the demands of a production facility which supplies a fixed quantity of finished products to outside buyers, at a fixed interval of time. In this model, an optimal multi-order policy for procurement of raw materials for a single manufacturing batch is developed to minimize the total cost. An integer approximation is adopted to refine the optimal solution. A worst-case scenario is also analyzed to demonstrate the effect of the setup costs on the total cost of the inventory system.
引用
收藏
页码:593 / 608
页数:16
相关论文
共 15 条
[1]   PRODUCTION LOT SIZING WITH WORK-IN-PROCESS CONSIDERATIONS IN RESPONSE TO PERIODIC DEMAND [J].
BANERJEE, A .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1992, 26 (1-3) :145-151
[2]   OPERATIONAL ECONOMIES OF A PROCESS POSITIONING DETERMINANT [J].
CHAKRAVARTY, AK ;
MARTIN, GE .
COMPUTERS & OPERATIONS RESEARCH, 1991, 18 (06) :515-530
[3]   SUPPLIER CUSTOMER INVENTORY RELATIONSHIPS UNDER JUST IN TIME [J].
CHAPMAN, SN ;
CARTER, PL .
DECISION SCIENCES, 1990, 21 (01) :35-51
[4]   ITERATIVE PROCEDURE FOR SINGLE-MACHINE MULTI-PRODUCT LOT SCHEDULING PROBLEM [J].
DOLL, CL ;
WHYBARK, DC .
MANAGEMENT SCIENCE SERIES A-THEORY, 1973, 20 (01) :50-55
[5]   ECONOMIC MANUFACTURING QUANTITY IN A JUST-IN-TIME DELIVERY SYSTEM [J].
GOLHAR, DY ;
SARKER, BR .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1992, 30 (05) :961-972
[6]   AN OPTIMAL BATCH SIZE FOR A PRODUCTION SYSTEM OPERATING UNDER A JUST-IN-TIME DELIVERY SYSTEM [J].
JAMAL, AMM ;
SARKER, BR .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1993, 32 (02) :255-260
[7]  
NEWMAN RG, 1988, PRODUCTION INVENTORY, V29, P45
[8]  
Pan A C, 1989, PRODUCTION INVENTORY, V30, P49
[9]   A STEPWISE PARTIAL ENUMERATION ALGORITHM FOR THE ECONOMIC LOT SCHEDULING PROBLEM [J].
PARK, KS ;
YUN, DK .
IIE TRANSACTIONS, 1984, 16 (04) :363-370
[10]   A STOCHASTIC INVENTORY PROBLEM WITH PIECEWISE QUADRATIC COSTS [J].
PARLAR, M ;
REMPALA, R .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1992, 26 (1-3) :327-332