A dispatching rule-based approach to production scheduling in a printed circuit board manufacturing system

被引:24
作者
Lee, GC
Kim, YD [1 ]
Kim, JG
Choi, SH
机构
[1] Korea Adv Inst Sci & Technol, Dept Ind Engn, Taejon 305701, South Korea
[2] Georgia Inst Technol, Sch Ind & Syst Engn, Atlanta, GA 30332 USA
[3] Daebul Univ, Fac e Business, Choongnam, South Korea
关键词
production scheduling; printed circuit board manufacturing; dispatching rules; simulation;
D O I
10.1057/palgrave.jors.2601601
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper focuses on a production-scheduling problem in a printed circuit board (PCB) manufacturing system that produces multiple product types with different due dates and different manufacturing processes. In the PCB manufacturing system, there is a number of serial workstations, and there are multiple parallel machines at each workstation. Also, setup operations are required at certain workstations or machines, and some product types have re-entrant flows. We develop new dispatching rules for scheduling at each workstation, considering the special features of PCB manufacturing. With the dispatching rules, we determine not only the start time of each lot at a machine but also the batch size of each product at each machine. Simulation experiments are carried out to test the performance of the production-scheduling method and dispatching rules devised in this study. Results show that the production-scheduling method suggested in this study performs better than methods with well-known dispatching rules and heuristic algorithms for lot sizing in terms of the total tardiness of orders.
引用
收藏
页码:1038 / 1049
页数:12
相关论文
共 32 条
[1]   Simple priority rule combinations: an approach to improve both flow time and tardiness [J].
Barman, S .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1997, 35 (10) :2857-2870
[2]   The impact of priority rule combinations on lateness and tardiness [J].
Barman, S .
IIE TRANSACTIONS, 1998, 30 (05) :495-504
[3]  
Blackstone Jr J. H., 1982, INT J PROD RES, V25, P1143
[4]   BRANCH AND BOUND ALGORITHM FOR THE FLOW-SHOP WITH MULTIPLE PROCESSORS [J].
BRAH, SA ;
HUNSUCKER, JL .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1991, 51 (01) :88-99
[5]   A comparative analysis of due date based job sequencing rules in a flow shop with multiple processors [J].
Brah, SA .
PRODUCTION PLANNING & CONTROL, 1996, 7 (04) :362-373
[6]   Heterogeneous dispatching rules in job and flow shops [J].
Caskey, K ;
Storch, RL .
PRODUCTION PLANNING & CONTROL, 1996, 7 (04) :351-361
[7]   A combined dispatching criteria approach to scheduling semiconductor manufacturing systems [J].
Dabbas, RM ;
Chen, HN ;
Fowler, JW ;
Shunk, D .
COMPUTERS & INDUSTRIAL ENGINEERING, 2001, 39 (3-4) :307-324
[8]   Computer simulation of a PCB production line: metamodeling approach [J].
Dengiz, B ;
Akbay, KS .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2000, 63 (02) :195-205
[9]  
Dessouky MM, 1997, J OPER RES SOC, V48, P647
[10]   THE ECONOMIC LOT-SCHEDULING PROBLEM - ACHIEVING FEASIBILITY USING TIME-VARYING LOT SIZES [J].
DOBSON, G .
OPERATIONS RESEARCH, 1987, 35 (05) :764-771