A heuristic for scheduling a permutation flowshop with makespan objective subject to maximum tardiness

被引:31
作者
Framinan, JM
Leisten, R
机构
[1] Univ Sevilla, Escuela Super Ingn, Seville 41092, Spain
[2] Univ Duisburg Essen, Fac Business & Econ, Duisburg, Germany
关键词
flowshop scheduling; bi-criteria; makespan; tardiness;
D O I
10.1016/j.ijpe.2004.12.004
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this paper, we tackle the problem of makespan minimisation in a permutation flowshop where the maximum tardiness is limited by a given upper bound. Since this problem is known to be NP-hard, we focus our attention on approximate approaches that allow obtaining good heuristic solutions to the problem. We first review the related literature and then propose a new algorithm. The algorithm is found to be competitive with the existing algorithms in terms of quality of the solution as well as in terms of the number of feasible solutions found. (c) 2005 Elsevier B.V. All rights reserved.
引用
收藏
页码:28 / 40
页数:13
相关论文
共 15 条
[1]   A heuristic for scheduling in a flowshop with the bicriteria of makespan and maximum tardiness minimization [J].
Chakravarthy, K ;
Rajendran, C .
PRODUCTION PLANNING & CONTROL, 1999, 10 (07) :707-714
[2]  
DANIELS RL, 1990, NAV RES LOG, V37, P981, DOI 10.1002/1520-6750(199012)37:6<981::AID-NAV3220370617>3.0.CO
[3]  
2-H
[4]   Benchmarks for shop scheduling problems [J].
Demirkol, E ;
Mehta, S ;
Uzsoy, R .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1998, 109 (01) :137-141
[5]  
DUDEK RA, 1964, OPERATIONS RES, V12
[6]   Different initial sequences for the heuristic of Nawaz, Enscore and Ham to minimize makespan, idletime or flowtime in the static permutation flowshop sequencing problem [J].
Framinan, JM ;
Leisten, R ;
Rajendran, C .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2003, 41 (01) :121-148
[7]   4 SIMPLE HEURISTICS FOR SCHEDULING A FLOW-SHOP [J].
GELDERS, LF ;
SAMBANDAM, N .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1978, 16 (03) :221-231
[8]   ON FLOWSHOP SCHEDULING WITH RELEASE AND DUE DATES TO MINIMIZE MAXIMUM LATENESS [J].
GRABOWSKI, J ;
SKUBALSKA, E ;
SMUTNICKI, C .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1983, 34 (07) :615-620
[9]  
Graham R. L., 1979, Discrete Optimisation, P287
[10]   OPTIMIZATION BY SIMULATED ANNEALING [J].
KIRKPATRICK, S ;
GELATT, CD ;
VECCHI, MP .
SCIENCE, 1983, 220 (4598) :671-680