Minimizing total completion time in a no-wait flowshop with sequence-dependent additive changeover times

被引:32
作者
Allahverdi, A [1 ]
Aldowaisan, T [1 ]
机构
[1] Kuwait Univ, Dept Mech & Ind Engn, Coll Engn & Petr, Safat, Kuwait
关键词
two-machine flowshop; setup time; no-wait; completion time; heuristics;
D O I
10.1057/palgrave.jors.2601110
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper addresses the problem of minimizing total completion time in a two-machine no-wait flowshop where setup times of the jobs are sequence-dependent. Optimal solutions are obtained for two special flowshops and a dominance relation is developed for the general problem. Several heuristic algorithms with the computational complexity of O(n(2)) and O(n(3)) are constructed. The heuristics consist of two phases: in the first phase a starting list is developed and in the second a repeated insertion technique is applied. Computational experience demonstrates that the concept of repeated insertion application is quite useful for any starting list and that solutions for all starting lists converge to about the same value of less than 1% after a few iterations.
引用
收藏
页码:449 / 462
页数:14
相关论文
共 36 条
[1]   FLOWSHOP NO-IDLE OR NO-WAIT SCHEDULING TO MINIMIZE THE SUM OF COMPLETION TIMES [J].
ADIRI, I ;
POHORYLES, D .
NAVAL RESEARCH LOGISTICS, 1982, 29 (03) :495-504
[2]   Total flowtime in no-wait flowshops with separated setup times [J].
Aldowaisan, T ;
Allahverdi, A .
COMPUTERS & OPERATIONS RESEARCH, 1998, 25 (09) :757-765
[3]   Scheduling in stochastic flowshops with independent setup, processing and removal times [J].
Allahverdi, A .
COMPUTERS & OPERATIONS RESEARCH, 1997, 24 (10) :955-960
[4]   A review of scheduling research involving setup considerations [J].
Allahverdi, A ;
Gupta, JND ;
Aldowaisan, T .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 1999, 27 (02) :219-239
[5]   Job lateness in flowshops with setup and removal times separated [J].
Allahverdi, A ;
Aldowaisan, T .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1998, 49 (09) :1001-1006
[6]  
ALLAHVERDI A, 1995, J OPER RES SOC, V46, P896, DOI 10.2307/2583973
[7]   Minimizing mean flowtime in a two-machine flowshop with sequence-independent setup times [J].
Allahverdi, A .
COMPUTERS & OPERATIONS RESEARCH, 2000, 27 (02) :111-127
[8]  
ALLAHVERDI A, 1994, NAV RES LOG, V41, P677, DOI 10.1002/1520-6750(199408)41:5<677::AID-NAV3220410509>3.0.CO
[9]  
2-7
[10]   SCHEDULING ON A 2-MACHINE FLOWSHOP SUBJECT TO RANDOM BREAKDOWNS WITH A MAKESPAN OBJECTIVE FUNCTION [J].
ALLAHVERDI, A ;
MITTENTHAL, J .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1995, 81 (02) :376-387