Minimizing total tardiness of orders with reentrant lots in a hybrid flowshop

被引:61
作者
Choi, SW
Kim, YD [1 ]
Lee, GC
机构
[1] Korea Adv Inst Sci & Technol, Dept Ind Engn, Taejon 305701, South Korea
[2] Univ Calif Davis, Inst Data Anal & Visualizat, Davis, CA 95616 USA
关键词
scheduling; hybrid flowshop; reentrant flows; heuristics;
D O I
10.1080/00207540500050071
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This study focuses on a hybrid flowshop scheduling problem, in which there are serial stages, each with identical parallel machines. In the hybrid flowshop, each order is composed of multiple lots with the same due date, and each lot can be processed on any one of parallel machines at each stage. In addition, there are reentrant flows since lots of certain orders have to visit the stages twice. Heuristic algorithms are suggested for the scheduling problem with the objective of minimizing total tardiness of a given set of orders. In these algorithms, the list-scheduling method is employed, and lots are scheduled with priorities determined with a construction method. Computational experiments are performed on randomly generated test problems. Results show that the suggested algorithms perform better than well-known dispatching rules for various scheduling problems and an algorithm that is used in a real system.
引用
收藏
页码:2149 / 2167
页数:19
相关论文
共 22 条
[1]  
Bertel S, 2004, EUR J OPER RES, V159, P651, DOI [10.1016/S0377-2217(03)00434-X, 10.1016/s0377-2217(03)00434-x]
[2]   Heuristics for scheduling in a flow shop with multiple processors [J].
Brah, SA ;
Loo, LL .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1999, 113 (01) :113-122
[3]   A comparative analysis of due date based job sequencing rules in a flow shop with multiple processors [J].
Brah, SA .
PRODUCTION PLANNING & CONTROL, 1996, 7 (04) :362-373
[4]   A shifting bottleneck approach for a parallel-machine flowshop scheduling problem [J].
Cheng, JL ;
Karuno, Y ;
Kise, H .
JOURNAL OF THE OPERATIONS RESEARCH SOCIETY OF JAPAN, 2001, 44 (02) :140-156
[5]   A heuristic algorithm for two-machine re-entrant shop scheduling [J].
Drobouchevitch, IG ;
Strusevich, VA .
ANNALS OF OPERATIONS RESEARCH, 1999, 86 (0) :417-439
[6]   Scheduling hybrid flowshops to minimize maximum tardiness or maximum completion time [J].
Guinet, AGP ;
Solomon, MM .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1996, 34 (06) :1643-1654
[7]   SCHEDULES FOR A 2-STAGE HYBRID FLOWSHOP WITH PARALLEL MACHINES AT THE 2ND STAGE [J].
GUPTA, JND ;
TUNC, EA .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1991, 29 (07) :1489-1502
[8]   A COMPARISON OF DISPATCHING RULES FOR JOB SHOPS WITH MULTIPLE IDENTICAL JOBS AND ALTERNATIVE ROUTEINGS [J].
KIM, YD .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1990, 28 (05) :953-962
[9]   Bottleneck-focused scheduling for a hybrid flowshop [J].
Lee, GC ;
Kim, YD ;
Choi, SW .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2004, 42 (01) :165-181
[10]   A dispatching rule-based approach to production scheduling in a printed circuit board manufacturing system [J].
Lee, GC ;
Kim, YD ;
Kim, JG ;
Choi, SH .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2003, 54 (10) :1038-1049