Schedule generation schemes for the job-shop problem with sequence-dependent setup times: Dominance properties and computational analysis

被引:53
作者
Artigues, C
Lopez, P
Ayache, PD
机构
[1] Lab Informat Avignon, CNRS, FRE 2487, F-84911 Avignon, France
[2] CNRS, LAAS, F-31077 Toulouse, France
关键词
scheduling theory; job-shop; sequence-dependent setup times; schedule generation scheme; dominance properties; priority rules;
D O I
10.1007/s10479-005-2443-4
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
We consider the job-shop problem with sequence-dependent setup times. We focus on the formal definition of schedule generation schemes (SGSs) based on the semi-active, active, and non-delay schedule categories. We study dominance properties of the sets of schedules obtainable with each SGS. We show how the proposed SGSs can be used within single-pass and multi-pass priority rule based heuristics. We study several priority rules for the problem and provide a comparative computational analysis of the different SGSs on sets of instances taken from the literature. The proposed SGSs significantly improve previously best-known results on a set of hard benchmark instances.
引用
收藏
页码:21 / 52
页数:32
相关论文
共 18 条
[11]   WORST-CASE ERROR-BOUNDS FOR PARALLEL MACHINE SCHEDULING PROBLEMS WITH BOUNDED SEQUENCE-DEPENDENT SETUP TIMES [J].
OVACIK, IM ;
UZSOY, R .
OPERATIONS RESEARCH LETTERS, 1993, 14 (05) :251-256
[12]   EXPLOITING SHOP-FLOOR STATUS INFORMATION TO SCHEDULE COMPLEX JOB SHOPS [J].
OVACIK, IM ;
UZSOY, R .
JOURNAL OF MANUFACTURING SYSTEMS, 1994, 13 (02) :73-84
[13]   List scheduling revisited [J].
Schutten, JMJ .
OPERATIONS RESEARCH LETTERS, 1996, 18 (04) :167-170
[14]   Practical job shop scheduling [J].
Schutten, JMJ .
ANNALS OF OPERATIONS RESEARCH, 1998, 83 (0) :161-177
[15]   On the application of insertion techniques for job shop problems with setup times [J].
Sotskov, YN ;
Tautenhahn, T ;
Werner, F .
RAIRO-RECHERCHE OPERATIONNELLE-OPERATIONS RESEARCH, 1999, 33 (02) :209-245
[16]   SEMIACTIVE, ACTIVE, AND NON-DELAY SCHEDULES FOR THE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM [J].
SPRECHER, A ;
KOLISCH, R ;
DREXL, A .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1995, 80 (01) :94-102
[17]   Survey of scheduling research involving setup times [J].
Yang, WH ;
Liao, CJ .
INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE, 1999, 30 (02) :143-155
[18]  
[No title captured]