Capacitated disassembly scheduling with random demand

被引:47
作者
Kim, Hwa-Joong [1 ]
Xirouchakis, Paul [2 ]
机构
[1] Inha Univ, Grad Sch Logist, Inchon 402751, South Korea
[2] Ecole Polytech Fed Lausanne, Swiss Fed Inst Technol Lausanne, Inst Prod & Robot STI IPR LICP, CH-1015 Lausanne, Switzerland
关键词
disassembly; production planning; stochastic inventory models; heuristics; PRODUCT; PARTS; OPTIMIZATION; HEURISTICS; LINE;
D O I
10.1080/00207540903469035
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper considers disassembly scheduling, which is the problem of determining the quantity and timing of the end-of-use/life products to be disassembled while satisfying the demand for their parts obtained from disassembling the products over a planning horizon. This paper focuses on the problem with stochastic demand of parts/modules, capacity restrictions on disassembly resources, and multiple product types with a two-level product structure. The two-level product structure implies that an end-of-use/life product is hierarchically decomposed into two levels where the first level corresponds to the parts/modules and the second level corresponds to the product. We formulate the problem as a stochastic inventory model and to solve the problem we propose a Lagrangian heuristic algorithm as well as an optimisation algorithm for the sub-problems obtained from Lagrangian decomposition. The test results on randomly generated problems show that the Lagrangian heuristic algorithm demonstrates good performance in terms of solution quality and time.
引用
收藏
页码:7177 / 7194
页数:18
相关论文
共 41 条
[1]   Lot sizing in reverse MRP for scheduling disassembly [J].
Barba-Gutierrez, Y. ;
Adenso-Diaz, B. ;
Gupta, S. M. .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2008, 111 (02) :741-751
[2]  
Boothroyd G., 1992, CIRP Annals - Manufacturing Technology, V41, P625, DOI [10.1016/S0007-8506(07)63249-1, DOI 10.1016/S0007-8506(07)63249-1]
[3]   Effectiveness of planning and control systems: an empirical study of US and Japanese firms [J].
Sheu, CW ;
Wacker, JG .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2001, 39 (05) :887-905
[4]   DETERMINISTIC PRODUCTION PLANNING - ALGORITHMS AND COMPLEXITY [J].
FLORIAN, M ;
LENSTRA, JK ;
RINNOOYKAN, AHG .
MANAGEMENT SCIENCE, 1980, 26 (07) :669-679
[5]   CONVERGENCE RATES OF SUBGRADIENT OPTIMIZATION METHODS [J].
GOFFIN, JL .
MATHEMATICAL PROGRAMMING, 1977, 13 (03) :329-347
[6]   Disassembly line in product recovery [J].
Güngör, A ;
Gupta, SM .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2002, 40 (11) :2569-2589
[7]   A solution approach to the disassembly line balancing problem in the presence of task failures [J].
Güngör, A ;
Gupta, SM .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2001, 39 (07) :1427-1467
[8]   SCHEDULING DISASSEMBLY [J].
GUPTA, SM ;
TALEB, KN .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1994, 32 (08) :1857-1866
[9]  
HELD M, 1974, MATH PROGRAM, V6, P63
[10]   Heuristics for solving disassemble-to-order problems with stochastic yields [J].
Inderfurth, K ;
Langella, IM .
OR SPECTRUM, 2006, 28 (01) :73-99