Optimizing resource utilization for repetitive construction projects

被引:110
作者
El-Rayes, K [1 ]
Moselhi, O
机构
[1] Univ Illinois, Dept Civil & Environm Engn, Urbana, IL 61801 USA
[2] Concordia Univ, Dept Bldg Civil & Environm Engn, Montreal, PQ H3G 1M8, Canada
来源
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE | 2001年 / 127卷 / 01期
关键词
Algorithms - Computer simulation - Optimization - Resource allocation - Strategic planning;
D O I
10.1061/(ASCE)0733-9364(2001)127:1(18)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Optimizing resource utilization can lead to significant reduction in the duration and cost of repetitive construction projects such as highways, high-rise buildings, and housing projects. This can be achieved by identifying an optimum crew size and interruption strategy for each activity in the project. Available dynamic programming formulations can be applied to provide solutions for this optimization problem; however, their application is limited, as they require planners to specify an arbitrary and an unbounded set of interruption options prior to scheduling. Such a requirement is not practical and may render the optimization problem infeasible. To circumvent the limitations of available formulations, this paper presents an automated and practical optimization model. The model utilizes dynamic programming formulation and incorporates a scheduling algorithm and an interruption algorithm so as to automate the generation of interruptions during scheduling. This transforms the consideration of interruption options, in optimizing resource utilization, from an unbounded and impractical problem to a bounded and feasible one. A numerical example from the literature is analyzed to illustrate the use and capabilities of the model.
引用
收藏
页码:18 / 27
页数:10
相关论文
共 14 条
[1]   FORMAL DEVELOPMENT OF LINE-OF-BALANCE TECHNIQUE [J].
ALSARRAJ, ZM .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1990, 116 (04) :689-704
[2]  
ARDITI D, 1986, ASCE J CONSTRUCTION, V112, P411
[3]  
ASHLEY DB, 1980, J CONSTRUCT DIV-ASCE, V106, P185
[4]  
BIRRELL GS, 1980, J CONSTRUCT DIV-ASCE, V106, P389
[5]   APPLICATION OF LINEAR SCHEDULING [J].
CHRZANOWSKI, EN ;
JOHNSTON, DW .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1986, 112 (04) :476-491
[6]  
El-Rayes K., 1998, Journal of Construction Management and Economics, V16, P433
[7]   SCHEDULING AND CONTROL OF LINEAR PROJECTS [J].
ELDIN, NN ;
SENOUCI, AB .
CANADIAN JOURNAL OF CIVIL ENGINEERING, 1994, 21 (02) :219-230
[8]  
JOHNSTON DW, 1981, J CONSTRUCT DIV-ASCE, V107, P247
[9]   SIREN - A REPETITIVE CONSTRUCTION SIMULATION-MODEL [J].
KAVANAGH, DP .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1985, 111 (03) :308-323
[10]   SCHEDULING OF REPETITIVE PROJECTS WITH COST OPTIMIZATION [J].
MOSELHI, O ;
ELRAYES, K .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1993, 119 (04) :681-697