Risk-based optimization of large flood-diversion systems using genetic algorithms

被引:39
作者
Afshar, Abbas [1 ]
Rasekh, Amin [1 ]
Afshar, Mohamad H. [1 ]
机构
[1] Iran Univ Sci & Technol, Dept Civil Engn, Tehran, Iran
关键词
risk-based design; flood-diversion system; genetic algorithms; uncertainty analysis; HYDROLOGIC UNCERTAINTIES; HYDRAULIC STRUCTURES; SPILLWAY CAPACITY; DESIGN-EVENTS; ESTIMATOR; INTERVAL; DAM;
D O I
10.1080/03052150802433213
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This article presents a robust and efficient risk-based genetic-algorithm model for the optimal design of large, temporary flood-diversion systems, in which the routing effect may not be disregarded. This article integrates the flood-routing process and uncertainties in flood-magnitude estimator, as well as the hydraulic uncertainties, into an optimization model. A modification to parameter uncertainty modelling is proposed that is verified using Monte Carlo simulation technique. System design capacity and dimensions are explicitly treated as decision variables. The performance of the model is demonstrated using a hypothetical case example. Furthermore, a series of sensitivity analyses are conducted to assess the effect of uncertainties in damage cost and construction time on the final results. The results indicate that these factors, as well as consideration of flood routing, could have a significant effect on the optimum design capacity of the system.
引用
收藏
页码:259 / 273
页数:15
相关论文
共 27 条
[11]   CONFIDENCE LIMITS FOR DESIGN EVENTS [J].
KITE, GW .
WATER RESOURCES RESEARCH, 1975, 11 (01) :48-53
[12]  
KOU JT, 2007, J HYDRAULIC ENG, V133, P955
[13]   Dam overtopping risk assessment considering inspection program [J].
Kuo, Jan-Tai ;
Hsu, Yung-Chia ;
Tung, Yeou-Koung ;
Yeh, Keh-Chia ;
Wu, Jian-De .
STOCHASTIC ENVIRONMENTAL RESEARCH AND RISK ASSESSMENT, 2008, 22 (03) :303-313
[14]   Mixed interval-fuzzy two-stage integer programming and its application to flood-diversion planning [J].
Li, Y. P. ;
Huang, G. H. ;
Nie, S. L. .
ENGINEERING OPTIMIZATION, 2007, 39 (02) :163-183
[15]   RANDOM-VARIABLES VERSUS UNCERTAIN VALUES - STOCHASTIC MODELING AND DESIGN [J].
LUND, JR .
JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT, 1991, 117 (02) :179-194
[16]   Floodplain planning with risk-based optimization [J].
Lund, JR .
JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT, 2002, 128 (03) :202-207
[17]  
*M GHODDS CONS ENG, 1990, KAR 3 RES REP
[18]   Case study: Dam safety during construction, lessons of the overtopping diversion works at Aguamilpa Dam [J].
Marengo, H. .
JOURNAL OF HYDRAULIC ENGINEERING, 2006, 132 (11) :1121-1127
[19]  
McCann M.M., 1984, Preliminary safety evaluation of existing dams, V1
[20]  
Peterson StevenJ., 2005, Construction Accounting and Financial Management, VFirst