Introduction to design and analysis of production systems

被引:2
作者
Askin, Ronald G. [1 ]
Dolgui, Alexandre [2 ]
Proth, Jean-Marie [3 ]
机构
[1] Arizona State Univ, Tempe, AZ 85287 USA
[2] Ecole Mines St Etienne, St Etienne, France
[3] INRIA, Sophia Antipolis, France
关键词
LINE BALANCING PROBLEM; OPTIMIZATION; PERFORMANCE; MODEL;
D O I
10.1016/j.ijpe.2009.01.001
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
引用
收藏
页码:271 / 275
页数:5
相关论文
共 17 条
[1]   Defining inventory control points in multiproduct stochastic pull systems [J].
Askin, Ronald G. ;
Krishnan, Shravan .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2009, 120 (02) :418-429
[2]   Constraint programming for project-driven manufacturing [J].
Banaszak, Z. A. ;
Zaremba, M. B. ;
Muszynski, W. .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2009, 120 (02) :463-475
[3]   A continuous model for supply planning of assembly systems with stochastic component procurement times [J].
Chauhan, Satyaveer S. ;
Dolgui, Alexandre ;
Proth, Jean-Marie .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2009, 120 (02) :411-417
[4]   Performance evaluation of production systems monitored by statistical process control and off-line inspections [J].
Colledani, Marcello ;
Tolio, Tullio .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2009, 120 (02) :348-367
[5]   Discrete forecast horizons for two-product variants of the dynamic lot-size problem [J].
Dawande, Milind ;
Gavirneni, Srinagesh ;
Naranpanawe, Sanjeewa ;
Sethi, Suresh R. .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2009, 120 (02) :430-436
[6]   The effect of dynamic worker behavior on flow line performance [J].
Digiesi, Salvatore ;
Kock, Ad A. A. ;
Mummolo, Giovanni ;
Rooda, Jacobus E. .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2009, 120 (02) :368-377
[7]   The endoscopy scheduling problem: A case study with two specialised operating rooms [J].
Fei, Hongying ;
Meskens, Nadine ;
Combes, Catherine ;
Chu, Chengbin .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2009, 120 (02) :452-462
[8]   Circulation of autonomous agents in production and service networks [J].
Gallay, Olivier ;
Hongler, Max-Olivier .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2009, 120 (02) :378-388
[9]   Comparison of exact and heuristic methods for a transfer line balancing problem [J].
Guschinskaya, Olga ;
Dolgui, Alexandre .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2009, 120 (02) :276-286
[10]   Queueing models for full-flexible multi-class call centers with real-time anticipated delays [J].
Jouini, Oualid ;
Dallery, Yves ;
Aksin, Zeynep .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2009, 120 (02) :389-399