A continuous model for supply planning of assembly systems with stochastic component procurement times

被引:30
作者
Chauhan, Satyaveer S. [1 ,2 ]
Dolgui, Alexandre [3 ]
Proth, Jean-Marie [4 ]
机构
[1] Concordia Univ, John Molson Sch Business, Montreal, PQ H3G 1M8, Canada
[2] CIRRELT, Montreal, PQ, Canada
[3] Ecole Mines St Etienne, Ctr Ind Engn & Comp Sci, F-42023 St Etienne, France
[4] INRIA SAGEP, F-57420 Pouilly, France
关键词
Assembly-to-order; Random lead-times; Supply planning; Optimization; Simulated annealing; LEAD TIMES; MRP SYSTEMS; UNCERTAINTY;
D O I
10.1016/j.ijpe.2008.11.015
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper studies a customized product assembly scenario where some components cannot be stocked due to high component cost and risk. We consider the case where these key components are ordered after a demand has been registered with a promised delivery date. Component lead-times are stochastic and associated distribution function is known in advance. The objective is to determine the ordering time for each component such as to minimize the sum of expected holding and backlogging costs. An approach to solve this problem is proposed and the algorithm is tested on a randomly generated data set. (C) 2009 Elsevier B.V. All rights reserved.
引用
收藏
页码:411 / 417
页数:7
相关论文
共 19 条
[1]   Planning order releases for an assembly system with random operation times [J].
Axsäter, S .
OR SPECTRUM, 2005, 27 (2-3) :459-470
[2]   A model for supply planning under lead time uncertainty [J].
Dolgui, A ;
Ould-Louly, MA .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2002, 78 (02) :145-152
[3]  
DOLGUI A., 1996, P 17 IFIP TC7 C SYST, P519
[4]  
DOLGUI A, 1995, J DECISION SYSTEMS, V4, P255, DOI DOI 10.1080/12460125.1995.10511659
[5]   Supply planning under uncertainties in MRP environments: A state of the art [J].
Dolgui, Alexandre ;
Prodhon, Caroline .
ANNUAL REVIEWS IN CONTROL, 2007, 31 (02) :269-279
[6]   LOT-SIZING IN ASSEMBLY SYSTEMS WITH RANDOM COMPONENT YIELDS [J].
GERCHAK, Y ;
WANG, YZ ;
YANO, CA .
IIE TRANSACTIONS, 1994, 26 (02) :19-24
[7]   A SIMULATION-BASED EXPERIMENTAL INVESTIGATION OF SUPPLY TIMING UNCERTAINTY IN MRP SYSTEMS [J].
GRASSO, ET ;
TAYLOR, BW .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1984, 22 (03) :485-497
[8]  
Gurnani H, 1996, IIE TRANS, V28, P865
[9]   Joint optimization of lot-sizes, safety stocks and safety lead times in an MRP system [J].
Molinder, A .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1997, 35 (04) :983-994
[10]   The MPS parameterization under lead time uncertainty [J].
Ould-Louly, MA ;
Dolgui, A .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2004, 90 (03) :369-376