Benefits and Barriers of Construction Project Monitoring Using High-Resolution Automated Cameras

被引:66
作者
Bohn, Jeffrey S. [1 ]
Teizer, Jochen [1 ]
机构
[1] Georgia Inst Technol, Sch Civil & Environm Engn, RAPIDS Lab, Atlanta, GA 30332 USA
关键词
Benefit cost ratios; Cameras; Construction management; Imaging techniques; Productivity; Remote sensing;
D O I
10.1061/(ASCE)CO.1943-7862.0000164
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
A more rapid and widespread use and implementation of technology in construction often fails since its benefits and limitations remain somewhat unclear. Project control is one of the most variable and time consuming task of construction project managers and superintendents and yet continues to be mostly a manual task. Controlling tasks such as tracking and updating project schedules can be assisted through remotely operating technology such as high-resolution cameras that can provide construction management and other users with imaging feeds of job site activities. Although construction cameras have been around for many years, the costs, benefits, and barriers of their use have not been investigated nor quantified in detail. Subsequently, definitions and understanding vary widely, making it difficult for decision makers at the organizational level to decide on the investment in camera technology. This paper reviews the status of high-resolution cameras and their present use in construction. Results of a multiphased survey to industry professionals were collected in order to identify benefits and barriers and develop a cost-benefit model that can be used for implementation technology in construction.
引用
收藏
页码:632 / 640
页数:9
相关论文
共 20 条
[11]   Dynamic 3D visualization of articulated construction equipment [J].
Kamat, VR ;
Martinez, JC .
JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2005, 19 (04) :356-368
[12]  
KATZ I, 2008, P INT S AUT ROB CONS
[13]   Reliability and stability buffering approach: Focusing on the issues of errors and changes in concurrent design and construction projects [J].
Lee, S ;
Pena-Mora, F ;
Park, M .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2006, 132 (05) :452-464
[14]   NIST research in autonomous construction [J].
Lytle, Alan M. ;
Saidi, Kamel S. .
AUTONOMOUS ROBOTS, 2007, 22 (03) :211-221
[15]   Research in automated measurement of project performance indicators [J].
Navon, R. .
AUTOMATION IN CONSTRUCTION, 2007, 16 (02) :176-188
[16]  
SENIOR BA, 1977, P ASCE CONSTR C ASCE, V5, P462
[17]   Tracking the location of materials on construction job sites [J].
Song, Jongchul ;
Haas, Carl T. ;
Caldas, Carlos H. .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2006, 132 (09) :911-918
[18]   Simulation-based identification of possible locations for mobile cranes on construction sites [J].
Tantisevi, Kevin ;
Akinci, Burcu .
JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2008, 22 (01) :21-30
[19]   Framework for real-time three-dimensional modeling of infrastructure [J].
Teizer, J ;
Kim, C ;
Haas, CT ;
Liapi, KA ;
Caldas, CH .
GEOLOGY AND PROPERTIES OF EARTH MATERIALS 2005, 2005, (1913) :177-186
[20]  
2008, ENG NEWS RECORD 0701