共 19 条
[1]
Scheduling cost optimization and neural dynamics model for construction
[J].
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE,
1997, 123 (04)
:450-458
[2]
Betrsekas D.P., 1987, DYNAMIC PROGRAMMING
[3]
Callahan M.T., 1992, CONSTRUCTION PROJECT
[4]
Optimizing resource utilization for repetitive construction projects
[J].
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE,
2001, 127 (01)
:18-27
[5]
Elmaghraby SE., 1977, ACTIVITY NETWORKS PR
[7]
Goldberg D.E., 1989, Genetic_Algorithms_in_Search,_Optimization,_and_Machine Learning
[8]
Cost optimization in projects with repetitive nonserial activities
[J].
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE,
2001, 127 (03)
:183-191
[9]
Optimization of resource allocation and leveling using genetic algorithms
[J].
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE,
1999, 125 (03)
:167-175