Modeling industrial lot sizing problems: a review

被引:226
作者
Jans, Raf [1 ]
Degraeve, Zeger [2 ]
机构
[1] RSM Erasmus Univ, NL-3000 DR Rotterdam, Netherlands
[2] London Business Sch, London NW1 4SA, England
关键词
production planning; lot sizing models; industry application;
D O I
10.1080/00207540600902262
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this paper we give an overview of recent developments in the field of modeling deterministic single-level dynamic lot sizing problems. The focus of this paper is on the modeling of various industrial extensions and not on the solution approaches. The timeliness of such a review stems from the growing industry need to solve more realistic and comprehensive production planning problems. First, several different basic lot sizing problems are defined. Many extensions of these problems have been proposed and the research basically expands in two opposite directions. The first line of research focuses on modeling the operational aspects in more detail. The discussion is organized around five aspects: the set ups, the characteristics of the production process, the inventory, demand side and rolling horizon. The second direction is towards more tactical and strategic models in which the lot sizing problem is a core substructure, such as integrated production-distribution planning or supplier selection. Recent advances in both directions are discussed. Finally, we give some concluding remarks and point out interesting areas for future research.
引用
收藏
页码:1619 / 1643
页数:25
相关论文
共 250 条
[61]   THE PERFORMANCE OF ROLLING PRODUCTION SCHEDULES IN A PROCESS INDUSTRY [J].
DEMATTA, R ;
GUIGNARD, M .
IIE TRANSACTIONS, 1995, 27 (05) :564-573
[62]   STUDYING THE EFFECTS OF PRODUCTION LOSS DUE TO SETUP IN DYNAMIC PRODUCTION SCHEDULING [J].
DEMATTA, R ;
GUIGNARD, M .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1994, 72 (01) :62-73
[63]   DYNAMIC PRODUCTION SCHEDULING FOR A PROCESS INDUSTRY [J].
DEMATTA, R ;
GUIGNARD, M .
OPERATIONS RESEARCH, 1994, 42 (03) :492-503
[64]   Joint production and pricing decisions with setup costs and capacity constraints [J].
Deng, Shiming ;
Yano, Candace A. .
MANAGEMENT SCIENCE, 2006, 52 (05) :741-756
[65]   Dynamic lot-sizing with setup cost reduction [J].
Denizel, M ;
Erenguc, S ;
Benson, HP .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1997, 100 (03) :537-549
[66]   DYNAMIC LOT SIZING FOR MULTIECHELON DISTRIBUTION-SYSTEMS WITH PURCHASING AND TRANSPORTATION PRICE DISCOUNTS [J].
DIABY, M ;
MARTEL, A .
OPERATIONS RESEARCH, 1993, 41 (01) :48-59
[67]   OPTIMAL SETUP TIME REDUCTION FOR A SINGLE-PRODUCT WITH DYNAMIC DEMANDS [J].
DIABY, M .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1995, 85 (03) :532-540
[68]   A LAGRANGEAN RELAXATION APPROACH FOR VERY-LARGE-SCALE CAPACITATED LOT-SIZING [J].
DIABY, M ;
BAHL, HC ;
KARWAN, MH ;
ZIONTS, S .
MANAGEMENT SCIENCE, 1992, 38 (09) :1329-1340
[69]   JOINT LOT SIZING AND SCHEDULING OF MULTIPLE ITEMS WITH SEQUENCE-DEPENDENT SETUP COSTS [J].
DILTS, DM ;
RAMSING, KD .
DECISION SCIENCES, 1989, 20 (01) :120-133
[70]   PRODUCTION-SCHEDULING PROBLEM WITH BATCH PROCESSING [J].
DORSEY, RC ;
HODGSON, TJ ;
RATLIFF, HD .
OPERATIONS RESEARCH, 1974, 22 (06) :1271-1279