Estimating future bidding performance of competitor bidders in capped tenders

被引:26
作者
Ballesteros-Perez, Pablo [1 ]
Carmen Gonzalez-Cruz, M. [2 ]
Fernandez-Diego, Marta [3 ]
Pellicer, Eugenio [4 ]
机构
[1] Univ Talca, Dept Construct Engn & Management, Curico, Chile
[2] Univ Politecn Valencia, Dept Project Engn, E-46071 Valencia, Spain
[3] Univ Politecn Valencia, Dept Business Adm, E-46071 Valencia, Spain
[4] Univ Politecn Valencia, Sch Civil Engn, E-46071 Valencia, Spain
关键词
construction; forecast; tender; auction; bid; score; MODEL; BIDS; TOOL;
D O I
10.3846/13923730.2014.914096
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Research in Bid Tender Forecasting Models (BTFM) has been in progress since the 1950s. None of the developed models were easy-to-use tools for effective use by bidding practitioners because the advanced mathematical apparatus and massive data inputs required. This scenario began to change in 2012 with the development of the Smartbid BTFM, a quite simple model that presents a series of graphs that enables any project manager to study competitors using a relatively short historical tender dataset. However, despite the advantages of this new model, so far, it is still necessary to study all the auction participants as an indivisible group; that is, the original BTFM was not devised for analyzing the behavior of a single bidding competitor or a subgroup of them. The present paper tries to solve that flaw and presents a stand-alone methodology useful for estimating future competitors' bidding behaviors separately.
引用
收藏
页码:702 / 713
页数:12
相关论文
共 46 条
[1]  
[Anonymous], 2009, Guidelines for Fighting Bid Rigging in Public Procurement: Helping Governments to Obtain Best Value for Money
[2]   Mathematical relationships between scoring parameters in capped tendering [J].
Ballesteros-Perez, P. ;
Gonzalez-Cruz, Ma C. ;
Canavate-Grimal, A. .
INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2012, 30 (07) :850-862
[3]   The iso-Score Curve Graph. A new tool for competitive bidding [J].
Ballesteros-Perez, P. ;
Gonzalez-Cruz, Ma. C. ;
Pastor-Ferrando, J. P. ;
Fernandez-Diego, M. .
AUTOMATION IN CONSTRUCTION, 2012, 22 :481-490
[4]   On competitive bidding: Scoring and position probability graphs [J].
Ballesteros-Perez, Pablo ;
Carmen Gonzalez-Cruz, Ma. ;
Canavate-Grimal, Antonio .
INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2013, 31 (03) :434-448
[5]   Detecting abnormal and collusive bids in capped tendering [J].
Ballesteros-Perez, Pablo ;
Carmen Gonzalez-Cruz, Ma ;
Canavate-Grimal, Antonio ;
Pellicer, Eugenio .
AUTOMATION IN CONSTRUCTION, 2013, 31 :215-229
[6]   The assessment of bidding strategy of Iranian construction firm [J].
Banki, M. T. ;
Esmaeeli, B. ;
Ravanshadnia, M. .
INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE AND ENGINEERING MANAGEMENT, 2009, 4 (02) :153-160
[7]   Competitor analysis in construction bidding [J].
Bee-Lan, O. O. ;
Drew, Derek S. ;
Runeson, Goran .
CONSTRUCTION MANAGEMENT AND ECONOMICS, 2010, 28 (12) :1321-1329
[8]  
Bee-Lan Oo, 2008, International Journal of Project Management, V26, P439, DOI 10.1016/j.ijproman.2007.06.001
[9]   Investigation of bid price competition measured through prebid project estimates, actual bid prices, and number of bidders [J].
Carr, PG .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2005, 131 (11) :1165-1172
[10]  
CARR RI, 1982, J CONSTRUCT DIV-ASCE, V108, P639