Job sequencing and component set-up on a surface mount placement machine

被引:26
作者
Gunther, HO
Gronalt, M
Zeller, R
机构
[1] Tech Univ Berlin, Dept Ind Management, D-10585 Berlin, Germany
[2] Univ Vienna, Dept Prod & Logist, Vienna, Austria
基金
奥地利科学基金会;
关键词
scheduling; sequencing; printed circuit boards; component set-up; assembly;
D O I
10.1080/095372898234424
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this paper, the problem of sequencing PCB assembly jobs on an automatic SMD placement machine is addressed. The objective is to minimize the makespan. Moreover, both the job arrival times and the precedence constraints for those jobs requiring component placement on the primary and secondary side of the same board must be taken into account. A considerable set-up time occurs when switching from one board type to another, which depends on the number of component feeders to be replaced in the magazine of the assembly machine. The exchange of component feeders is complicated by the fact that each feeder occupies a different number of magazine positions. Theoretically, the minimum makespan required for a given batch of jobs could be derived by solving the order sequencing and the component set-up problems simultaneously. However, optimal solutions are practically unattainable for problems of realistic size. Therefore, efficient heuristic solution procedures are developed which exploit component commonality between PCB types. The numerical results obtained indicate the practicality of the proposed heuristics in an industrial application.
引用
收藏
页码:201 / 211
页数:11
相关论文
共 19 条
[1]  
ASKIN RG, 1994, NAV RES LOG, V41, P587, DOI 10.1002/1520-6750(199408)41:5<587::AID-NAV3220410502>3.0.CO
[2]  
2-Q
[3]   A HEURISTIC FOR MINIMIZING THE NUMBER OF TOOL SWITCHES ON A FLEXIBLE MACHINE [J].
BARD, JF .
IIE TRANSACTIONS, 1988, 20 (04) :382-391
[4]   JOBS AND TOOL SEQUENCING IN AN AUTOMATED MANUFACTURING ENVIRONMENT [J].
CHANDRA, P ;
LI, S ;
STAN, M .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1993, 31 (12) :2911-2925
[5]  
Crama Y., 1994, International Journal of Flexible Manufacturing Systems, V6, P33, DOI 10.1007/BF01324874
[6]   Production scheduling in SMT electronic boards assembly [J].
Garetti, M ;
Pozzetti, A ;
Tavecchio, R .
PRODUCTION PLANNING & CONTROL, 1996, 7 (02) :197-204
[7]  
GRONALT M, 1996, 9 INT WORK SEM PROD, V3, P523
[8]   Workload planning in small lot printed circuit board assembly [J].
Günther H.-O. ;
Grunow M. ;
Schorling C. .
Operations-Research-Spektrum, 1997, 19 (2) :147-157
[9]   THE TRAVELING SALESMAN PROBLEM - AN OVERVIEW OF EXACT AND APPROXIMATE ALGORITHMS [J].
LAPORTE, G .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1992, 59 (02) :231-247
[10]   PRODUCT BATCHING AND BATCH SEQUENCING FOR NC PUNCH PRESSES [J].
LEE, CY ;
LIMAN, SD ;
WIRAKUSUMAH, A .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1993, 31 (05) :1143-1156